当前位置:文档之家› 建筑 给排水 外文翻译 英文文献 多层住宅建筑给排水设计的几个问题

建筑 给排水 外文翻译 英文文献 多层住宅建筑给排水设计的几个问题

建筑 给排水 外文翻译  英文文献 多层住宅建筑给排水设计的几个问题
建筑 给排水 外文翻译  英文文献 多层住宅建筑给排水设计的几个问题

译文来源:美国PE杂志建筑给排水工程师2010年第10期

The multilevel residential housing is given and drains off water several questions designed

Summary : This text give and drain off water on multilevel residential housing design supply water the exertion of the tubular product , Way of laying of pipeline, water gauge produce family set up, establishment and air conditioner condensation water of pot-type boiler discharge issue goes on the discussion , And put forward some concrete views.

Keyword: Skyscraper, supply water the tubular product , the pipeline is laid, The water gauge, the solar water heater

The skyscraper is simple with its auxiliary facility, the fabrication cost is low, the characteristic such as being convenient of estate management, Receive the welcomes of the real estate developer and vast resident of small and medium-sized cities very much. How project planning and design of inhabited region, scientific and technological industry of comfortable house, lead the request according to 2000, Improve the design level of the house, build out a comfortable living space for each household, It is each designers duty. As the heart of the house --The kitchen, bathroom, is that the function is complicated, hygiene, safe and comfortable degree are expected much, It is miscellaneous to build, the space expecting much in technology. So, the designer must consider synthetically with the idea and method of global design that the kitchen, bathroom give installation of the drainage pipeline and equipment,etc. . Give and drain off water on skyscraper design supply water exertion, to lay pipeline of tubular product, water gauge produce family set up, establishment and empty of pot-type boiler now Transfer condensation water discharge issue discuss together with colleagues.

( 1)supply water tubular product select problem for use Traditional watersupply tubular product adopt zinc-plated steel tube generally, because zinc-plated steel tube exchange the corrosion, Use short-lived , use for and send domestic water can satisfied with water quality sanitary standard shortcoming, Ministry of Construction is popularizing the application of the feed pipe of plastics energetically . A lot of districts and cities have already expressed regulations: Forbid designing and using the zinc-plated steel tube , use widely the feed pipe of plastics. The plastics supply water In charge of compared with metal pipeline, light, it is fine to able to bear the intensity of keeping, Send obstruction little liquid , able to bear chemistry better to corrode performance, it is convenient to install, The steel energy-conservation of the province, merit of having long performance life etc.. Supply water and use plastics pipeline: Hard polyvinyl chloride( PVC-U), high density polyethylene( HDPE), pay and unite polyethylene( PEX) , modify the polypropylene( PP-R, PP-C), gather butene( PB), aluminium mould and compound and in charge of and the steel is moulded and compound and is managed etc.. Choice of tubular product economic comparative

course of technology, technology should from pressure, temperature, environment for use, install method,etc. go on and consider, Combine owners at the same time request and the house of grade,carry on and fix after being consider synthetically technology not economic. The above plastics supply water tubular product can supply water tubular product as house life. The economic and functional house conciliating Strand room in the face of the masses of with low- and medium-level incomes resident, can select for use hygiene grades of hard polyvinyl chloride in charge of as feed pipe mainly, In order to reduce the fabrication cost; Medium-to-high grade commodity apartment available aluminium Mould and compound and in charge of or other plastics supply water the tubular product as the feed pipe. House mix hot water temperature that water order exceed 600 C, so above-mentioned tubular product in charge of except hard polyvinyl chloride and aluminium plastics compound and in charge of( PE-AL-PE), Mostly the tubular product can be regarded as the hot water pipeline of the house.

( 2) pipeline lay problem 1. give and drain off water it set up there arent one that in charge of

1)Will install it in the corner place of the kitchen, bathroom tomorrow. Adopting this kind of way of laying more in the design of house in the past, it is convenient for it to construct, But will reveal the pipeline and hinder the room beautifully tomorrow Watch, the households will mostly be hidden with the light quality material in the equipment two times.

2)Will install it in the overcast angle place of the outer wall of the building tomorrow. Way this suitable for southern weather warm district only, the minimum temperature in winter cant be lower than zero degrees Centigrade, In case water pipe water-logging freeze ice is bloated to split pipeline, influence household use. Pipeline lay in outer wall, influence building to be beautiful, too inconvenient on manage and maintain in the future.

3)Lay it in the pipeline well. This way makes the room clean and beautiful , but the pipeline well has taken up the area of the bathroom, And pipeline construct, maintain relatively more difficult. Bathroom set up concentrate pipeline well, concentrate pipeline on assign in the well feed pipe, drain pipe, This is that the civilized importance lives in the kitchen of comfortable house, bathroom Embodiment.

I think : Should consider the establishment of the pipeline well of the bathroom in the medium-to-high grade building conceptual design of commodity apartment, Improve quality of using of bathroom promptly so , can solve hard polyvinyl chloride drain pipe rivers noise heavy problem, Improve the environmental quality level of the room; Whether for bathroom in the areas for little economic and functional house and Overcome difficulties room, warm area give and drain off water and set up and in charge of and can consider and lay in the outer wall in the South, In order to increase using the space of the bathroom; Pipeline install and in the room, should influence kitchen, bathroom every sanitary equipment use of function tomorrow

2. supply water and prop up there arent tube House supply water prop up and in charge of pipe diameter one ≤ 32mm, de of battle,, little plastics feed pipe of pipe diameter is the crooked state, So the house supplies water and is propped up and in

charge of being recommended and adopted and set up secretly. Supply water to prop up to manage darkly There are thes way had:

1)Set up in the brick wall secretly. Wall turn on and in charge of trough in brick when constructing, in charge of trough width tube +20 mm, de of external diameter,, degree of depth tube external diameter de, The pipeline is imbedded and managed directly Trough, and with in charge of card fix in trough of inning charge of son.

2)Whether pipe diameter supply water and prop up and last de ≤ 20mm,can set up at floor secretly piece make level by layer. Turn on and in charge of trough in floor( ground) the board when constructing, it wides trough have to be de +10 mm deeply 1/2 of the de, Half pipeline imbed and in charge of trough, and with in charge of card fix in trough of inning charge of tube. Aluminium mould compound and in charge of and pay and unite polypropylene in charge of pipeline adopt metal pipe fittings connection, Must strengthen and in charge of trough size when adopting and set up secretly, and rivers some flood peak loss relatively heavy. Assign the relative house that concentrated to the kitchen, bathroom interior hygiene utensil, Can adopt and divide Water device go on and join , divide water device whether one more than branch in charge of and connect, every hygiene utensil supply water and prop up and in charge of and connects and publishes from the water dividing device separately. Can already prevent the tube burying the pipeline secretly from being connected like this Permeate the question. Can reduce some flood peak lost, decrease the fabrication cost of pipe networks

3)Drain off water and prop up the tube to lay House room drain off water and in charge of and should set up at the time of inning this each, drain off water and in charge of permeating sideways like this canning prevent the sewage from waiting for the pollutant to enter the neighbor family sideways, Will not influence the neighbor either when the pipeline is maintained Normal life of one. Kitchen wash water drainage of basin propped up and in charge of generallying inserts draining off water to stand to manage this layer of floor sideways; Floor drain drain off water propped up and in charge of laying the room of lower floor. A lot of colleagues think now: Whether kitchen the ground it lay ceramic tile of,whose name is clean in when need develop with water,not strong in meaning to set up floor drain, So kitchen set up ground floor drain, avoid and drain off water and prop up and in charge of and enter neighbor family sideways already so, Can increase using the space of the kitchen . Bathroom drain off water and prop up and in charge of and lay concrete measure have in this layer sideways inside:

1)Improve the bathroom ground . Ground tendency high 150mm, adopt back row type take stool pot, washing basin, bath tub, water drainage of floor drain in charge of and bury in cushion layer secretly sideways.

2)Adopt the sinking type bathroom. Bathroom sink 350mm the floor, hygiene utensil drain off water and in charge of and bury on sinking space secretly sideways Two method these can realize water drainage of bathroom prop up and in charge of earths surface to bury underground this one without entering the neighbor family sideways. Bury pipeline when installing, construction quality must check on strictly, can construct bathroom ground after confirming qualified secretly, So as not

to leave the hidden danger in giving in the future using. Bathroom ground construct and can pack coal ash light quality material , also can adopt and lay bricks impracticable to lay plate making construct ground, Ground must make waterproof to deal with, method can waterproof to deal with according to roofing, make two oil one rubber and plastic ointment waterproof cloth.

3) water gauge the open air set up problem The water gauge is had indoors, not only the work load of checking meter is very heavy , but also make the security and privacy of the house reduce greatly . So house divide into households of water gauge or divide households of figure of water gauge Show that should be set up in the open air. Skyscraper water gauge the open air set up following several kinds of forms: Whether 1.adopt far it pass by water gauge Change the ordinary water gauge into and pass the water gauge far, is joined the water gauge and data gathering machine by a signal line, And then reach intelligence to manage( the computer). Its merit lies in saving a large amount of people Strength comes to check meter, the data are accurate, the shortcoming is that the fabrication cost is high. Whether 2.adopt magnetic stripe card of by water gauge Users buy the electronic card of the running water Company in advance , then insert it in the storing device of the water gauge, Card amount of money deduct automatically on the water, this way user need to prepay the water rate, The price of the water gauge is relatively high.

3. adopt it set up at the open air water gauge not ordinary

1)The water gauge is set up in the stair have a rest in the alcove of the platform. Household watersupply to prop up and manage and enter the kitchen, bathroom after the water gauge is measured. Way this realize water gauge produce room set up, equivalence low project have , supply water and set up and in charge of and set up with water gauge office results in aesthetic problems in stair. It suitable for the South warm district kitchen, bathroom assign close to the houses of positions of staircase.

2)The water gauge concentrates on being set up among the water gauges( meter box). Person who give when supplying water, set up water gauge in ground floor( meter box) on falling, every household watersupply to prop up and is in charge of applying having in the pipeline well, Southern area can overcast horn place lay along the outer wall in building too; Person who give when supplying water, can set up water gauge in roof( meter box) under upgoing. This way increases and supplies water to prop up In charge of and lay length, pipeline lay and influence building to be beautiful along outer wall. Water gauge produce way choice that family assign, must combine house kitchen, bathroom plane assign characteristic and concrete request of developer, Carry on to several feasibility scheme the above economic technology fix after comparing. Property well-managed medium-to-high grade commodity apartment of housing district, can adopt and pass the water gauge far , It is that the water gauge will use the developing direction in the future; Estate management perfect medium- to-high grade commodity apartment of housing district, can adopt magnetic stripe card water gauge( Company have this kind district of business can design in running water) Or concentrate on setting up it among the water gauges( case); Southern area unit type house can set up rest platform office in stair with ordinary water gauge, In order to reduce the fabrication cost.

4) establishment question of the pot-type boiler Should reserve and install hot water supply terms of facility, set up hot water supply facilities with when the design of house. Have and concentrate house that hot water supply on , should consider house assign with installation position and cold hot water pipeline of hot water device. The pot-type boiler generally has three kinds, such as gas, electricity, solar energy,etc.. Whether last kitchen gas heater and electric heater or Bathroom inside, give when draining off water design shoulding reserve installation position and cold hot water interface of pipeline of water heater in advance in building, Install by oneself when convenient users fit up. Solar energy and hot water It is simple and convenient and safe for device to use, need fuel and electric power is low to run the expenses, Have long performance life, pollution-free, received by the masses of users favourably very much, Many houses have been small in recent years The district all install the solar water heater at the time of designing and construct. Solar water heater install and at the roof, need to set up the cold hot water pipeline among bathroom and water heater of the roofing like this generally, Consider installation of solar water heater when the design of house, household can only lay cold and hot pipeline along the building outer wall when installing in the future, Increase household degree of difficulty when installing like this , increase pipeline make the investment, influence building beautiful. Give when draining off water the design needing to solicit the developers suggestion first in building, Interconnected system one design, construct the solar water heater in unison; Reserve solar water heater and cold hot water installation position of pipeline in advance only. The cold hot water pipeline of the solar water heater can be laid In the pipeline well; Set up pipeline house of well , can set up one UPVC drain pipe of de110 as solar water heater hot water sleeve pipe of pipeline close to corner of person who take a shower in bathroom, Set up a de110 *75 three direct links in each hygiene interval ground, as connecting the entry of cold and hot water pipe

( 5) air conditioner condensation ink discharge the issue In recent years, air conditioner enter huge numbers of families gradually, condensation water amorphous to discharge the building outer wall of pollution air conditioner have, Have influenced a beautiful important problem of biotope already. Building give when draining off water design shoulding consider air conditioner condensation ink discharge in a organized way. Concrete method can machine set up the water drain pipe of the condensation by the position outside reserving air conditioner, Drain off water and set up and in charge of and select PVC-U drain pipe de40 for use , reserve three direct links of draining off water highly in each air conditioner, It is convenient for air conditioner to drain off water hose insert directly.

译文来源:美国PE杂志建筑给排水工程师2010年第10期

多层住宅建筑给排水设计的几个问题

摘要:本文就多层住宅建筑给排水设计中给水管材的选用,管道的敷设方式,水表出户设置,家用热水器的设置及空调冷凝水排放等问题进行探讨,并提出一些具体看法。

关键词:多层住宅,给水管材,管道敷设,水表,太阳能热水器

多层住宅以其配套设施简单,造价低,物业管理方便等特点,很受中小城市房地产开发商和广大居民的欢迎。如何按2000年小康住宅科技产业工程居住区规划设计导则的要求,提高住宅的设计水平,为每个住户营造出一个舒适的生活空间,是每个设计人员的职责所在。作为住宅的心脏――厨房、卫生间,是功能复杂,卫生、安全和舒适度要求高,营造繁杂,技术要求高的空间。因此,设计人员必须以整体设计的观念和方法,综合考虑厨房、卫生间给排水管道和设备的安装等。下面就多层住宅给排水设计中给水管材的选用、管道的敷设、水表出户设置、家用热水器的设置和空调冷凝水排放等问题与同行们一起探讨。

(一)给水管材选用问题

传统的给水管材一般采用镀锌钢管,由于镀锌钢管易锈蚀,使用寿命短,用于输送生活用水不能满足水质卫生标准等缺点,建设部正大力推广塑料给水管的应用。许多地市已明文规定:禁止设计使用镀锌钢管,推广使用塑料给水管。塑料给水管与金属管道相比,具有重量轻,耐压强度好,输送液体阻力小,耐化学腐蚀性能强,安装方便,省钢节能,使用寿命长等优点。给水用塑料管道主要有:硬聚氯乙烯(PVC-U)、高密度聚乙烯(HDPE)、交联聚乙烯(PEX)、改性聚丙烯(PP-R ,PP-C)、聚丁烯(PB)、铝塑复合管(PE-AL-PE,PEX -AL-PEX)和钢塑复合管等。

管材的选择是经济技术的比较过程,技术上应从压力、温度、使用环境、安装方法等方面进行考虑,同时结合业主的要求和住宅的档次,进行经济技术综合考虑后确定。以上所塑料给水管材都可作为住宅生活给水管材。经济适用房和解困房主要面对广大中低收入居民,可选用卫生级硬聚氯乙烯管(PVC-U)作为给水管,以降低造价;中高档商品房可用铝塑复合管(PE-AL-PE,PEX-

AL-PEX)或其他塑料给水管材作为给水管。住宅配水点的热水温度不超过600C,因此上述管材中除硬聚氯乙烯管(PVC-U)和铝塑料复合管(PE-AL -PE)外,大多管材可作为住宅的热水管道。

(二)管道敷设问题

1.给排水立管的敷设一般有以下几种方式

1)明装在厨房、卫生间的墙角处。在以往的住宅设计中较多采用这种敷设方式,它施工方便,但明露管道有碍居室美观,住户在二次装修时大多会用轻质材料给予隐藏起来。

2)明装在建筑物外墙阴角处。这种方式仅适用于南方天气较暖和的地区,冬季的最低温度不得低于零摄氏度,以防水管内水冻结成冰,胀裂管道,影响住户使用。管道在外墙敷设,影响建筑美观,也不便于日后管理和维修。

3)敷设在管道井内。这种方式使居室洁净美观,但管道井占用了卫生间的面积,且管道施工、维修都比较困难。卫生间设立集中管道井,把给水管、排水管都集中在管道井里布置,这是小康住宅厨房、卫生间居住文明的重要体现。本人认为:在中高档的商品房建筑方案设计时应考虑卫生间管道井的设置,这样即提高卫生间的使用质量,又可解决硬聚氯乙烯排水管水流噪声大的问题,提高居室的环境质量水平;对于卫生间面积较小的经济适用房和解困房,在南方较暖和地区给排水立管可考虑敷设在外墙,以增大卫生间的使用空间;管道明装在室内时,应不影响厨房、卫生间各卫生设备功能的使用。

2.给水支管敷设

住宅给水支管管径一役de≤32mm,小管径的塑料给水管,呈弯曲状态,故住宅给水支管提介采用暗设。给水支管暗设的方式有:

1)暗设在砖墙里。施工时在砖墙面开管槽,管槽宽度为管子外径de+20mm,深度为管子外径de,管道直接嵌入管槽,并用管卡将子固定在管槽内。

2)对于小管径给水支管de≤20mm,可暗设在楼(地)面找平层里。施工时在楼(地)板面上开管槽,槽宽为de+10mm,深为1/2de,管道半嵌入管槽里,并用管卡将管子固定在管槽内。铝塑复合管和交联聚丙烯管等管道采用金属管件连接,采用暗设时须加大管槽尺寸,且水流局部水头损失较大。对于厨房、

卫生间内卫生器具布置相对集中的住宅,可采用分水器进行连接,分水器是一种多分支管接头,各卫生器具给水支管分别从分水器接出。这样既可避免暗埋管道的管接头渗透问题。又可减小局部水头损失,降低管网造价。

3)排水支管敷设

住宅室内排水横管宜设在本层套内,这样排水横管渗透时可避免污水等污染物进入邻户,管道维修时也不会影响到邻户的正常生活。

厨房内洗涤盆的排水横支管一般在本层楼板面上接入排水立管;地漏排水支管须敷设下层空间。现在许多同行都认为:厨房地面都铺设瓷砖,清洁地在时不须用水冲洗,设置地漏意义不大,故厨房内可不设地地漏,这样既避免排水横支管进入邻户,又可增大厨房的使用空间。

卫生间内排水横支管在本层敷设具体措施有:

1)提高卫生间地面。地面势高150mm,采用后排式坐便器,洗脸盆、浴盆和地漏的排水横管暗埋在垫层内。

2)采用下沉式卫生间。卫生间楼板面下沉350mm,卫生器具排水横管暗埋在下沉空间里。

这两种做法均可实现卫生间的排水横支管埋设本层的地面而不进入邻户。暗埋管道安装时,施工质量一定要严格把关,经验收合格后方可施工卫生间地面,以免给日后使用中留下隐患。卫生间地面施工可填充煤灰等轻质材料,亦可采用砌砖架空铺设制板施工地面,地面须做防水处理,做法可参照屋面防水处理,如做两油一布橡塑油膏防水。

(三)水表户外设置问题

水表设在户内,不但抄表的工作量很大,而且使住宅的安全性和私密性大大降低。故住宅的分户水表或分户水表的数字显示宜设在户外。多层住宅水表户外设置有以下几种形式:

1.采用远传水表

把普通水表换成远传水表,由一根信号线连接水表与数据采集机,再传至智能管理(微机)。它的优点在于节省大量人力来抄表,数据准确,缺点是造价高。

2.采用磁卡式水表

用户预先购买自来水公司的电子卡,然后把它插入水表的存贮器内,用水时卡上金额被自动扣除,这种方式用户需预付水费,水表价格较高。

3.采用普通水表设在户外

1)水表设在楼梯休息平台的壁龛里。住户给水支管经水表计量后进入厨房、卫生间。这种方式实现了水表出房设置,工程等价低,但给水立管和水表设在楼梯处影响美观。它适用于南方较暖和地区厨房、卫生间布置靠近楼梯间位置的住宅。

2)水表集中设在水表间(水表箱)。下行上给式供水时,在底层设水表间(水表箱),各层住户给水支管在管道井内敷设,南方地区也可在建筑物阴角处沿外墙敷设;上行下给式供水时,可在屋顶设水表间(水表箱)。这种方式增加给水支管敷设长度、管道沿外墙敷设影响建筑物美观。水表出户布置的方式选择,须结合住宅厨房、卫生间平面布置特点和开发商的具体要求,对以上几种可行性方案进行经济技术比较后确定。物业管理完善的住宅小区的中高档商品房,可采用远传水表,它是今后水表应用发展方向;物业管理不完善的住宅小区的中高档商品房,可采用磁卡式水表(在自来水公司有这种业务的地区可设计)或集中设置水表间(箱);南方地区单元式住宅可用普通水表设在楼梯的休息平台处,以降低造价。

(四)家用热水器的设置问题

住宅设计时应预留安装热水供应设施的条件,或设置热水供应设施。所以在没有集中热水供应的住宅,应考虑家用热水器的安装位置及冷热水管道布置。家用热水器一般有燃气、电、太阳能等三种。燃气热水器和电热水器一般安装在厨房或卫生间内,在建筑给排水设计时应预留出热水器的安装位置和冷热水管道的接口,便于用户装修时自行安装。太阳能热水器使用简便安全,无需燃料及电力,运行费用低,使用寿命长,无污染,很受广大用户的欢迎,近几年来有不少的住宅小区在设计施工时就全部安装上了太阳能热水器。太阳能热水器一般安装在屋顶上,这样就需要在卫生间与屋面热水器之间设置冷热水管道,住

宅设计时若不考虑太阳能热水器的安装,今后住户安装时只能将冷热管道沿建筑物外墙敷设,这样既增加住户安装时的难度,增加管线投资,又影响建筑的美观。所以在建筑给排水设计时需要先征求开发商的意见,是否统一设计,统一施工太阳能热水器;或只预留出太阳能热水器及冷热水管道的安装位置。太阳能热水器的冷热水管道可敷设在管道井内;不设管道井的住宅,可在卫生间靠近沐浴器的墙角增设一根de110的UPVC排水管作为太阳能热水器热水管道的套管,在每户卫生间距地面1m处设一个de110×75三通,作为冷热水管的接入口。

(五)空调冷凝水排放问题

近几年,空调逐渐进入千家万户,空调冷凝水无组织排放污染建筑物外墙,已是影响生活区美观的一个重要问题。建筑给排水设计时应考虑空调冷凝水的有组织排放。具体做法可在预留空调外机位置旁设置冷凝水排水管,排水立管选用PVC-U排水管de40,在每层空调机高度预留排水三通,便于空调机排水软管直接接入。

译文来源:美国PE杂志建筑给排水工程师2010年第10期

建筑类外文文献及中文翻译

forced concrete structure reinforced with an overviewRein Since the reform and opening up, with the national economy's rapid and sustained development of a reinforced concrete structure built, reinforced with the development of technology has been great. Therefore, to promote the use of advanced technology reinforced connecting to improve project quality and speed up the pace of construction, improve labor productivity, reduce costs, and is of great significance. Reinforced steel bars connecting technologies can be divided into two broad categories linking welding machinery and steel. There are six types of welding steel welding methods, and some apply to the prefabricated plant, and some apply to the construction site, some of both apply. There are three types of machinery commonly used reinforcement linking method primarily applicable to the construction site. Ways has its own characteristics and different application, and in the continuous development and improvement. In actual production, should be based on specific conditions of work, working environment and technical requirements, the choice of suitable methods to achieve the best overall efficiency. 1、steel mechanical link 1.1 radial squeeze link Will be a steel sleeve in two sets to the highly-reinforced Department with superhigh pressure hydraulic equipment (squeeze tongs) along steel sleeve radial squeeze steel casing, in squeezing out tongs squeeze pressure role of a steel sleeve plasticity deformation closely integrated with reinforced through reinforced steel sleeve and Wang Liang's Position will be two solid steel bars linked Characteristic: Connect intensity to be high, performance reliable, can bear high stress draw and pigeonhole the load and tired load repeatedly.

建筑工程及给排水专业中英文对照翻译

Laminar and Turbulent Flow Observation shows that two entirely different types of fluid flow exist. This was demon- strated by Osborne Reynolds in 1883 through an experiment in which water was discharged from a tank through a glass tube. The rate of flow could be controlled by a valve at the outlet, and a fine filament of dye injected at the entrance to the tube. At low velocities, it was found that the dye filament remained intact throughout the length of the tube, showing that the particles of water moved in parallel lines. This type of flow is known as laminar, viscous or streamline, the particles of fluid moving in an orderly manner and retaining the same relative positions in successive cross- sections. As the velocity in the tube was increased by opening the outlet valve, a point was eventually reached at which the dye filament at first began to oscillate and then broke up so that the colour was diffused over the whole cross-section, showing that the particles of fluid no longer moved in an orderly manner but occupied different relative position in successive cross-sections. This type of flow is known as turbulent and is characterized by continuous small fluctuations in the magnitude and direction of the velocity of the fluid particles, which are accompanied by corresponding small fluctuations of pressure. When the motion of a fluid particle in a stream is disturbed, its inertia

零售企业营销策略中英文对照外文翻译文献

零售企业营销策略中英文对照外文翻译文献(文档含英文原文和中文翻译)

译文: 零售企业的营销策略 Philip Kotlor 今天的零售商为了招徕和挽留顾客,急欲寻找新的营销策略。过去,他们挽留顾客的方法是销售特别的或独特的花色品种,提供比竞争对手更多更好的服务提供商店信用卡是顾客能赊购商品。可是,现在这一切都已变得面目全非了。现在,诸如卡尔文·克连,依佐和李维等全国性品牌,不仅在大多数百货公司及其专营店可以看到,并且也可以在大型综合商场和折扣商店可以买到。全国性品牌的生产商为全力扩大销售量,它们将贴有品牌的商品到处销售。结果是零售商店的面貌越来越相似。 在服务项目上的分工差异在逐渐缩小。许多百货公司削减了服务项目,而许多折扣商店却增加了服务项目。顾客变成了精明的采购员,对价格更加敏感。他们看不出有什么道理要为相同的品牌付出更多的钱,特别是当服务的差别不大或微不足道时。由于银行信用卡越来越被所有的商家接受,他们觉得不必从每个商店赊购商品。 百货商店面对着日益增加的价格的折扣店和专业商店的竞争,准备东山再起。历史上居于市中心的许多商店在郊区购物中心开设分店,那里有宽敞的停车场,购买者来自人口增长较快并且有较高收入的地区。其他一些则对其商店形式进行改变,有些则试用邮购盒电话订货的方法。超级市场面对的是超级商店的竞争,它们开始扩大店面,经营大量的品种繁多的商品和提高设备等级,超级市场还增加了它们的促销预算,大量转向私人品牌,从而增加盈利。 现在,我们讨论零售商在目标市场、产品品种和采办、服务以及商店气氛、定价、促销和销售地点等方面的营销策略。 一、目标市场 零售商最重要的决策时确定目标市场。当确定目标市场并且勾勒出轮廓时,零售商才能对产品分配、商店装饰、广告词和广告媒体、价格水平等作出一致的决定。如沃尔玛的目标市场相当明确:

建筑学毕业专业外文翻译文献doc资料

本科毕业设计(外文翻译) 题目居住区交往空间规划与设计 院(系部)xxx学院 专业名称xx 年级班级xx 学生姓名xx 指导教师xx xx 年xx 月x 日 Planning and Design of Association Space of residential District

Xia dong liang 【Abstract】:The association space refers to the indoor and outdoor space for communication between residents.The article presents an overall discussion of the necessity,hierarchy and functionality of association space,with a wish to create positive and healthy association atmosphere and stimulate good communication among residents so that the residential area can become a homeland full of love and harmony. 【Keyword】:residential area;association space;necessity;hierarchy;Functionality 【Foreword】:As the housing system reform and the rapid development of real estate, urban residential areas large urban settlements have emerged on the layout of residential buildings, public buildings, public green space, life and living facilities such as roads, to provide urban residents live in the community and The establishment, is an integral part of the city. Exchanges between the living room area residents is to communicate and exchange of indoor and outdoor space. At this stage, people's living standards greatly improved the living environment of continuous improvement district. Developers should not only focus on residential construction and the reasonable comfort, paying greater attention to the construction of residential environment. However, the current environment in the construction of residential areas, they are often the natural ecology of greening the environment is much more to consider, and the promotion of exchanges between the residents of the space environment to consider less, environmental construction can not meet the occupants of the psychological characteristics and needs. From the basic physiological needs gradually to meet the psychological and cultural fields of promoting a higher level, the residential area is not only the function of living, but also people's thinking and feelings of the local exchange. Therefore, the strengthening of exchanges between the residential areas of space construction, increase residential neighbourhood affinity, should be developed in the planning and construction of residential areas should also consider the issue. How to conduct exchanges between the residential areas of space planning and design, improve people's quality of life, the author of his own real estate development

市场营销_外文翻译_外文文献_英文文献_顾客满意策略与顾客满意

顾客满意策略与顾客满意营销 原文来源:《Marketing Customer Satisfaction 》自20世纪八十年代末以来, 顾客满意战略已日益成为各国企业占有更多的顾客份额, 获得竞争优势的整体经营手段。 一、顾客满意策略是现代企业获得顾客“货币选票”的法宝随着时代的变迁, 社会物质财富的极大充裕, 顾客中的主体———消费者的需求也先后跨越了物质缺乏的时代、追求数量的时代、追求品质的时代, 到了20世纪八十年代末进入了情感消费时代。在我国, 随着经济的高速发展,我们也已迅速跨越了物质缺乏时代、追求数量的时代乃至追求品质的时代, 到今天也逐步迈进情感消费时代。在情感消费时代, 各企业的同类产品早已达到同时、同质、同能、同价, 消费者追求的已不再是质量、功能和价格, 而是舒适、便利、安全、安心、速度、跃动、环保、清洁、愉快、有趣等,消费者日益关注的是产品能否为自己的生活带来活力、充实、舒适、美感和精神文化品位, 以及超越消费者期望值的售前、售中、售后服务和咨询。也就是说, 今天人们所追求的是具有“心的满足感和充实感”的商品, 是高附加值的商品和服务,追求价值观和意识多元化、个性化和无形的满足感的时代已经来临。 与消费者价值追求变化相适应的企业间的竞争, 也由产品竞争、价格竞争、技术竞争、广告竞争、品牌竞争发展到现今的形象竞争、信誉竞争、文化竞争和服务竞争, 即顾客满意竞争。这种竞争是企业在广角度、宽领域的时空范围内展开的高层次、体现综合实力的竞争。它包括组织创新力、技术创新力、管理创新力、产业预见力、产品研发力、员工向心力、服务顾客力、顾客亲和力、同行认同力、社会贡献力、公关传播沟通力、企业文化推动力、环境适应力等等。这些综合形象力和如何合成综合持久的竞争力, 这就是CSft略所要解决的问题。CS寸代,企业不再以“自己为中心”,而是以“顾客为中心”;“顾客为尊”、“顾客满意”不再是流于形式的口号, 而是以实实在在的行动为基础的企业经营的一门新哲学。企业不再以质量达标, 自己满意为经营理念, 而是以顾客满意, 赢得顾客高忠诚度为经营理念。企业经营策略的焦点不再以争取或保持市场占有率为主, 而是以争取顾客满意为经营理念。因此, 营销策略的重心不再放在竞争对手身上而是放在顾客身上, 放在顾客现实的、潜在的需求上。当企业提供的产品和服务达到了顾客事先的期望值, 顾客就基本满意;如果远远超越顾客的期望值, 且远远高于其他同行, 顾客才真正满意;如果企业能不断地或长久地令顾客满意, 顾客就会忠诚。忠诚的顾客不仅会经常性地重复购买, 还会购买企业其它相关的产品或服务;忠诚的顾客不仅会积极向别人推荐他所买的产品, 而且对企业竞争者的促销活动具有免疫能力一个不满意的顾客会将不满意告诉16-20个人, 而每一个被告知者会再传播给12-15个人。这样, 一个不满意者会影响到二、三百人。在互联网普及的今天, 其影响则更大。据美国汽车业的调查, 一个满意者会引发8笔潜在的生意, 其中至少有一笔会成交。而另一项调查表明, 企业每增加5%的忠诚顾客, 利润就会增长25%-95%。一个企业的80%的利润来自20%的忠诚顾客;而获取一个新顾客的成本是维持一个老顾客成本的6倍。所以,美国著名学者唐?佩 珀斯指出: 决定一个企业成功与否的关键不是市场份额, 而是在于顾客份额。 于是, 企业纷纷通过广泛细致的市场调研、与消费者直接接触、顾客信息反馈等方式来了解顾客在各方面的现实需求和潜在需求。依靠对企业满意忠诚的销售、服务人员, 定期、定量地对顾客满意度进行综合测定, 以便准确地把握企业经营中与“顾客满意” 目标的差距及其重点领域, 从而进一步改善企业的经营活动。依靠高亲和力的企业文化、高效率的人文管理和全员共同努力, 不断地向顾客提供高附加值的产品, 高水准的亲情般的服

给排水专业毕业设计英文翻译--中英文对照

河北建筑工程学院 毕业设计(论文)外文资料翻译 系别:城建系 专业:给水排水工程 班级: 姓名: 学号: 外文出处:Wan Fang foreign languages (用外文写) literature datebase 附件:1、外文原文;2、外文资料翻译译文。

1、外文原文(复印件) Supplying and draining waterin hospital construction With the fact that modern medicine science promptness develops,new technique , the new armamentarium are continuing without end , modernized medical treatment thereby consonant with that is building a hospital , are also are confronted with new design idea and new technology applying. Disregarding secondary hospital building function , what whose gets along environment, still , finclause the hospital builds equipment and is equipped with system, the request is without exception higher and higher. Because of it is to ensure daily work living not only need the rapid and intense life relevance recovering from the illness , avoiding crippling , rescuing, and promote with giving treatment to a patient. Not only the design accomplishing to the special field draining away water need to satisfy the request being unlike a function in hospital building on equipment , but also safety is be obliged to reliable. Following is built according to the hospital. 一HOSPITAL GIVES A SEWERAGE 1) Modernized hospital equipment and equipment system content is numerous , the function is peculiar , the request is very high. Except demanding to swear to continue supplying with the use water according with quality level sufficiently, need more according to demand of different medical treatment instrument and different administrative or tehcnical office to water quality , water pressure , the water temperature, classify setting up water treatment system and be in progress to system to increase pressure reduction. 2) The hospital operating rooms , the delivery room operation the water hygiene, saliva washing hands by shower bath water , the dentistry dentistry chair ought to adopt the water purifying degassing. In the homeland few are large-scale , the high rank hospital centre supplies a room, the centre disinfecting has also adopted to purify the water disinfecting, now that swear to there be no dust , the sterility , to remove the pathopoiesia source , to avoid the blockage infecting , cutting down equipment microtubule. 3) Hospital preparation rooms preparation uses water to adopt distilled water, and sets up in making distilled water system to have part pressure boost facilities. The handicraft responds to according to different hospital preparation handicraft but fixes concrete system distilled water, should satisfy demand of whose handicraft to water quality , water yield , water pressure act in close coordination that the preparation handicraft reserves corresponding to drain-pipe and

建筑学专业毕业设计方案外文翻译二44

毕业设计英文资料翻译 Tran slati on ofthe En glish Docume nts for Graduati on Desig n 课题名称_____________________________________ 院< 系)_____________________________________ 专业 _____________________________________ 姓名 _____________________________________ 学号 _____________________________________ 起讫日期 _____________________________________ 指导教师 _____________________________________ 2018 年2月25日 原文: Abstract:Gree n buildi ng refers to do its best to maximize con servati on of resources (en ergy, land, water, and wood> , protecti ng the environment and reduce polluti on in its life cycle. Provide people with healthy, appropriate and efficient use of space, and nature in harmony symbiosis buildings. Idescribed more details of green building design ' notion, green building ' design, as well as the sig ni fica nee of the con

文献检索课程教学设计(全部)

《文献检索》课程教学设计 目录 绪论:文献(信息)检索的意义及基础 (2) 项目一科技文献检索方法和图书馆的科学利用 (8) 项目二常见化学化工科技论文的写作 (11) 项目三美国化学文摘的使用 (14) 项目四专利文献的查询 (17) 项目五标准文献的查询 (20) 项目六计算机信息检索的应用 (23) 项目七信息检索策略综合应用训练 (26)

徐州工业职业技术学院教学设计(讲稿)

教学内容与设计 绪论:文献(信息)检索的意义及基础 自我介绍 提问一:你会检索吗? 如果会,那么会用检索以下毕业专题的相关资料吗? ?杜仲叶中绿原酸的提取分离 ?有机废水处理工艺设计 ?蚕丝蛋白制备工艺研究 ?铁矿石含铁量测定方法新工艺 ?基因工程干扰素生产工艺研究 提问的目的:突出检索技术直接是为毕业专题服务,这是一门技术。提问二:信息检索课是什么? 学生如是说: 文献检索课程是井底之蛙的升降机,是雄鹰的翅膀,是横跨天堑的桥梁。 针对某一课题,通过电子检索查阅有关资料,才知道知识的浩瀚,才知道世界的宽广,才知道“山外青山,楼外楼”。 它是我在大学期间所学的最重要,最有用的课程之一,有了它,我们将会受益终生。教会我们一种方法,一种主动 了解外界,提高自己,放眼世界的方法。 检索不仅是我们学习的制胜法宝,更是一条贯穿我们生活的红线。正因为有了这门课的学习,现在大脑的检索意识 就比较强烈,越搜越快!前几天,问同学借自行车,他告 诉我车子大致地点,是永久牌,有车栏,略有一点蓝。到 了现场,脑海中一下就有了先找有栏的,再找蓝颜色的, 最后确定是不是永久的,很快就找到了。 我爱检索,就像爱自己的生命一样。 最后我想说,我们是幸运的!我们学到了一门真正有用的课,它对我的影响和帮助将是伴随我一身的。 提问三:借鉴与创新的关系? 科学研究是“站在前人肩膀上”的事业,而创新又是科学研究的灵魂,即要求“前无古人”。 时间分配 2min 引导学生回答 8min 10min 通过往届学生对信息检索课的评价能够激起学生学习这门课的兴趣,也可以突出这门课对个人的作用。 10min 通过提问让学生

差异化营销策略外文文献翻译

文献出处: Dalman, M. Deniz, and Junhong Min. "Marketing Strategy for Unusual Brand Differentiation: Trivial Attribute Effect." International Journal of Marketing Studies 6.5 (2014): 63-72. 原文 Marketing Strategy for Unusual Brand Differentiation: Trivial Attribute Effect Dalman, M. Deniz & Junhong Min Abstract This research investigates that brand differentiation creating superior values can be achieved not only by adding meaningful attributes but also meaningless attributes, which is called "trivial attribute effect." Two studies provided empirical evidences as following; first, trivial attribute effect creates a strong brand differentiation even after subjects realize that trivial attribute has no value. Second, trivial attribute effect is more pronounced in hedonic service category compared to the utilitarian category. Last, the amount of willingness to pay is higher when trivial attribute is presented and evaluated in joint evaluation mode than separate evaluation mode. Finally, we conclude with discussion and provide suggestions for further research. Keywords: brand differentiation, evaluation mode, service industry, trivial attribute Introduction Problem Definition Perhaps the most important factor for new product success is to create the meaningful brand differentiation that provides customers with superior values beyond what the competitors can offer in the same industry (Porter, 1985). Not surprisingly, more than 50 percent of annual sales in consumer product industries including automobiles, biotechnology, computer software, and pharmaceuticals are attributed to such meaningful brand differentiation by including new or noble attributes (Schilling &Hill, 1998). However, the brand differentiation that increases consumer preference is not only by introducing meaningful attributes but also meaningless attributes. For

给排水专业外文翻译

History of Water Supply Man’s search for pure water began in prehistoric times. Much of his earliest activity is subject to speculation. Some individuals might have led water where they wanted it through trenches dug in the earth, a hollow log was perhaps used as the first water pipe. Thousands of years must have passed before our more recent ancestors learned to build cities and enjoy the convenience of water pipes to the home and drains for water-carried wastes. Our earliest archeological records of central water supply and wastewater disposal date back about 5000 years, to Nippur of Sumeria. In the ruins of Nippur there is an arched drain with the stones set in full "voussoir" position, each stone being a wedge tapering downward into place. Water was drawn from wells and cisterns.An extensive system of drainage conveyed the wastes from the palaces and residential districts of the city. The earliest recorded knowledge of water treatment is in the Sanskrit medical lore and Egyptian Wall inscri ptions. Sanskrit writings dating about 2000 B.C. tell how to purify foul water by boiling in copper vessels,exposing to sunlight, filtering through charcoal, and cooling in an earthen vessel. The earliest known apparatus for clarifying liquids was pictureed on Egyptian walls in the fifteenth and thirteenth centuries B.C. The first picture represents the siphoning of either water of settled wine. A second picture shows the use of wick siphons in an Egyptian kitchen. The first engineering report on water supply and treatment was made in A.D. 98 by Sextus Julius Frontinus, water-commissioner of Rome. He produced two books on the water supply of Rome. In these he described a settling reservoir at the head of one of the aqueducts. His writings were first translated into English by the noted hydraulic engineer Clemens Herschel in 1899. In the eight century A.D. an Arabian alchemist,Geber,wrote a rather specialized treatise on distillation that included various stills for water and other liquids. The English philosopher Sir Francis Bacon wrote of his experiments on the purification of water by filtration, boiling, distillation and clarification by coagulation. This was published in 1627, one year after his death. Bacon also noted that clarifying water trends to improve health and increase the "pleasure of the eye". The first known illutrated descri ption of sand filters was published in 1685 by Luc Antonio Porzio, an Italian physician. He wrote a book on conserving the health of soldier in camps, based on his experience in the Austro-Turkish War. This was probably the earliest published work on mass sanitation.He described and illustrated the use of sand filters and sedimentation. Porzio also stated that his filtration was the same as "by those who built the wells in the Palace of the Doges in Venice and in the palace of Cardinal Sachett,at Rome." The oldest known archeological examples of water filtration are in Venice and the colonies she occupied. The ornate heads on the cisterns bear dates,but it is not known when the filters were placed.Venice,Built on a Series of islands, depended on catching and storing rainwater for its principal freshwater supply for over 1300 years. Cisterns were built and many were connected in stone-grated catch basins and then filtered through sand into cisterns. A comprehensive article on the water supply of Venice appeared in the Practical Mechanics Journal in 1863.The land area of Venice was 12.85 acres and the average yearly rainfall was 32 inches(in). Nearly all of this rainfall was collected in 177 public and 1900 private cisterns. These

建筑-外文翻译

外文文献: Risk Analysis of the International Construction Project By: Paul Stanford Kupakuwana Cost Engineering Vol. 51/No. 9 September 2009 ABSTRACT This analysis used a case study methodology to analyse the issues surrounding the partial collapse of the roof of a building housing the headquarters of the Standards Association of Zimbabwe (SAZ). In particular, it examined the prior roles played by the team of construction professionals. The analysis revealed that the SAZ’s traditional construction project was generally characterized by high risk. There was a clear indication of the failure of a contractor and architects in preventing and/or mitigating potential construction problems as alleged by the plaintiff. It was reasonable to conclude that between them the defects should have been detected earlier and rectified in good time before the partial roof failure. It appeared justified for the plaintiff to have brought a negligence claim against both the contractor and the architects. The risk analysis facilitated, through its multi-dimensional approach to a critical examination of a construction problem, the identification of an effective risk management strategy for future construction projects. It further served to emphasize the point that clients are becoming more demanding, more discerning, and less willing to accept risk without recompense. Clients do not want surprise, and are more likely to engage in litigation when things go wrong. KEY WORDS:Arbitration, claims, construction, contracts, litigation, project and risk The structural design of the reinforced concrete elements was done by consulting engineers Knight Piesold (KP). Quantity surveying services were provided by Hawkins, Leshnick & Bath (HLB). The contract was awarded to Central African Building Corporation (CABCO) who was also responsible for the provision of a specialist roof structure using patented “gang nail” roof

相关主题
文本预览
相关文档 最新文档