Test Plan
REVISION HISTORY
目录
1.Introduction (3)
1.1 Test Plan Objectives (3)
2.1Background (4)
2. Reference document (4)
2.1 Document List (4)
3.Test Resources (5)
3.1Human Resources (5)
3.2Test environment (5)
3.3Test Tools (5)
4. Scope of Testing (6)
4.1 Applications and Functions to be Tested (6)
4.2 Applications and Functions not to be Tested (6)
5.Test Methodology (6)
5.1 Overall Approach to Testing (6)
5.2 Test Documentation (7)
5.3 Review, Acceptance and Approval of Test Documentation (7)
5.4 Recording of Test Results (7)
5.5 Correction of Faults (8)
1.Introduction
1.1 Test Plan Objectives
2.1Background
2.R eference document 2.1 Document List
3.Test Resources 3.1Human Resources
3.2Test environment
3.3Test Tools
4. Scope of Testing
4.1 Applications and Functions to be Tested
4.2 Applications and Functions not to be Tested
5.Test Methodology
5.1 Overall Approach to Testing
5.2 Test Documentation
5.3 Review, Acceptance and Approval of Test
Documentation
This Test Plan and other documents referred to above, will be subject to the following
5.4 Recording of Test Results
Refer to Module Test case
5.5 Correction of Faults
In the document named logl_yd_prof_msg_template, there are a solecism. So that the program can not run. the program run
In the java_setting .the information is wrong , so that the program can not to connect with MQ. Mend the wrong .the program run .