Yantai Moon

□CONTROLLED NO. 烟台冰轮股

UNCONTROLLED NO.

QUALITY CONTROL MANUAL

质量控制手册

FOR

THE SHOP CONSTRUCTION

OF

PRESSURE VESSELS AND PARTS

压力容器和部件建造

IN ACCORDANCE WITH

ASME BOILER AND PRESSURE VESSEL CODE

SECTION Ⅷ, DIVISION 1

符合ASME锅炉及压力容器规范第Ⅷ卷第1册

ISSUE DATE:JAN 17,2008 EFFECTIVE DATE:JAN 17,2008 2008年1月17日发布2008年1月17日实施Address: No.1 Binglun Road,Zhifu District,Yantai,Shandong 264002,P.R.China

地址:中国山东省烟台市芝罘区冰轮路1号264002

Telephone

(+86-535) 6697062 6584990

电话:

Fax

(+86-535) 6642776 6584991

传真:

E-mail

ylrq@https://www.doczj.com/doc/0b17298727.html,

电子邮件:

TABLE OF CONTENTS

目录

CHAPTER

章TITLE

标题

REV. N0.

修改标记

DATE

日期

——COVER SHEET

0 1/17/2008封面

A TABLE OF CONTENTS

0 1/17/2008目录

B STATEMENT OF POLICY AUTHORIZATION

0 1/17/2008政策授权声明

C TERMS AN

D ABBREVIATIONS

0 1/17/2008缩略词

1 CONTROL OF MANUAL

0 1/17/2008手册的管理

2 ORGANIZATION

0 1/17/2008组织机构

3 DRAWINGS, DESIGN CALCULATIONS AND

SPECIFICATIONS CONTROL 0 1/17/2008图纸、设计计算和技术条件的管理

4 MATERIAL CONTROL

0 1/17/2008材料管理

5 EXAMINATION AND INSPECTION PROGRAM

0 1/17/2008检验和试验程序

6 CORRECTION OF NONCONFORMITIES

0 1/17/2008不一致品的处理

7 WELDING CONTROL

0 1/17/2008焊接管理

8 NONDESTRUCTIVE EXAMINATION

0 1/17/2008无损检验

9 HEAT TREATMENT

热处理

0 1/17/2008

10 CALIBRATION OF EXAMINATION

MEASUREMENT AND TEST EQUIPMENT 0 1/17/2008检测和试验设备的校准

11 RECORD RETENTION

0 1/17/2008文件保管

12 AUTHORIZED INSPECTOR

0 1/17/2008授权检验师

13 EXHIBIT FORM

0 1/17/2008样表

Prepared by Examination Section Chief Date 制订:质量检验科长日期:

Approved by QA Manager Date 批准:质保经理日期:

Accepted by Authorized Inspector Date 认可:授权检验师日期:

STATEMENT OF POLICY AUTHORIZATION 政策授权声明

Yantai Moon Co.,Ltd. has established the QC sy stem for U certificate of authorization under the rules of the ASME Boiler and Pressure Vessel Code Section VIII Division 1 to assure that the Code Items manufactured by YTMC are in compliance with the ASME Code and Custome r’s requirements and this QC Manual.

为了确保我公司产品符合ASME规范、用户和该质量控制手册的要求,按照ASME锅炉压力容器规范第Ⅷ卷第1册的要求,建立了烟台冰轮股份有限公司获取U授权证书的质量控制体系。

The QC Manual is a written description of the QC Sy stem .It is mandatory that all indiv iduals of YTMC must perform their work activ ities in accordance with the requirements of this QC Manual and the Code.

质量控制手册是该体系的文字叙述,全体员工在制造规范产品时,必须严格遵照该手册和ASME 规范执行,不得违反。

The QA Manager is hereby giv en the responsibility and authority to assure that all phases of the QC Sy stem are prepared and implemented properly in accordance with the ASME Code and this QC Manual.

授权质保经理负责保证质量控制体系符合ASME规范和本手册的规定,并得到全面贯彻。

The QA Manager has the organizational freedom to identify quality control problems and to initiate, recommend and provide solutions.

授权质保经理组织上的独立权,判定和解决所有的问题。

The QA Manager shall report to me the status and adequacy of the QC System. He has the authority to stop work until the quality problems have been properly resolv ed. Any dispute between the QA Manager and any other responsible person shall be resolv ed by me within the Code, design justification and the requirements of this QC Manual.

质保经理应向总经理汇报质控体系的状况,并提出质量控制的系统报告,他有权发布停止制造的命令直至质量问题得到妥善解决。在质保经理和其他部门负责人之间有争议未能解决的问题,应提交总经理根据规范、设计技术条件和本手册的要求作最后裁决。

The QA Manager shall be responsible for 质保经理负责与授权检验师保持密切联系,对

Authoriz ed Inspector. Any rev ision of the QC

Manual shall be carried out with the prior

acceptance of the AI.

验师(AI)认可。

There are two versions of this QC Manual, one is the English version, the other is Chinese. If any conflict is encountered between these two versions, the English v ersion shall take precedence, and the Chinese version shall be rev ised to concur with the English v ersion.

本质量控制手册有两种文本(英文和中文)。如在使用中,中、英两种文本发生矛盾,则以英文本为准,并修改中文本以保持与英文本一致。

General Manager 总经理Signature 签名:Date 日期:

TERMS AND ABBREVIATIONS

缩略词

AI Authoriz ed Inspector 授权检验师

AIS Authoriz ed Inspector Superv isor 授权主任检验师

ASME American Society of Mechanical Engineers 美国机械工程师学会

CC Certificate of Compliance 合格证书

COL Check Off List 工艺检验流程卡

JIC Joint Identification Card 焊缝识别卡

MAWP Max imum Allowable Working Pressure 最大允许工作压力

MAEWP Max imum Allowable External Working Pressure 最大允许外部工作压力

MDMT Minimum Design Metal Temperature 最小设计金属温度

MDR Manufacturer's Data Report 制造厂数据报告

MTR Material Test Report 材料试验报告

NB National Board of Boiler and Pressure Vessel Inspectors 美国国家锅炉及压力容器检验师总部

NCR Nonconformity Report 不一致品处理通知单

NDE Nondestructiv e Ex amination 无损检测

PFC Process Flow Chart 工艺流程图

PQR Procedure Qualification Record 工艺评定报告

PT Liquid Penetrant Examination 液体渗透探伤

PV Pressure Vessel 压力容器

PWHT Post Welding Heat Treatment 焊后热处理

QA Quality Assurance 质量保证

QC Quality Control 质量控制

RT Radiographic Ex amination 射线探伤

WPQ Welder’s Performance Qualification 焊工技能评定

WOPQ Welding Operator’s Performance Qualification 焊接操作工技能评定

WPS Welding Procedure Specification 焊接工艺说明书

YTMC Yantai Moon Company Limited 烟台冰轮股份有限公司

Customer Specification 用户说明书Applicable specifications from the customer 用户提供的适用的说明书

Code 规范The ASME Boiler and Pressure Vessel Code Section Ⅷ,Div.1 including referencing Code Sections therein.

ASME锅炉及压力容器规范第Ⅷ卷第1册

Code Items 规范产品As used in this Manual, are pressure v essels or their parts designed, manufactured, ex amined, tested and inspected in accordance with the

在本手册中提到的,符合规范设计、生产、检验、检测要求的压力容器或其零件

Customer 用户The organiz ation purchasing Section Ⅷ, Div. 1 items. 购买符合规范第Ⅷ卷第1册要求产品的组织

1.0 CONTROL OF MANUAL 1.0 手册管理

This Chapter describes the procedure and requirements for the control of the QC Manual.

本章规定了质量控制手册的管理程序和要求。

1.1 General 1.1总则

1.1.1 YTMC has established this QC Manual to maintain a QC System that meets all the applicable requirements of the ASME Boiler and Pressure Vessel Code Section VIII Div.1. 1.1.1 本手册的目的是使在我公司建立的质量控制体系能够保持有效的运转,确保所制造的压力容器和零部件能符合ASME锅炉及压力容器规范第Ⅷ卷第1册。

1.1.2 The QC Manual shall be prepared by the Examination Section chief and approved by the QA Manager. They shall sign and date to show their preparation and approval on the TABLE OF CONTENTS of Chapter A. The QC Manual shall be presented to the AI for acceptance prior to implementation. The AI’s acceptance shall be indicated by signature and date on the TABLE OF CONTENTS page of Chapter A. 1.1.2 本手册由公司压力容器厂质检科长制订,由质保经理批准。他们将在A章的目录页上签字并签日期。质控手册在执行之前,要交给AI认可,AI认可后将在A章的目录页上签字和签日期。

1.1.3 The Examination Section Chief shall review the Code Edition and Addenda annually and document the review results on the Code Revision Review Check List (Exhibit 1-1). The QC Manual and procedures shall be revised as necessary to comply with the latest Code Edition and Addenda. The Check List shall be reviewed by the QA Manager to assure that all required changes have been incorporated into the QC Manual and concerned procedures. These required 1.1.3 质检科长负责规范版本和增补的核对,并将核对结果填写在规范修改核实表上(样表1-1)。质控手册和规程的修改要符合最新版本的规范和增补的要求。核实表将由质保经理审核以保证所有更改要求已结合到质量控制手册和相关规程中。所要求的修改应在规范修订日起的6个月内实施。

revisions shall be implemented within six months of the Edition and addenda issue date.

1.1.4 There are two types of QC Manual, controlled and uncontrolled copy. Only the controlled copy shall be used to implement the required quality control activities in YTMC. A controlled copy shall be issued and kept current by controlled distribution as described in this Chapter. An uncontrolled copy is for external use only and is current only at the time of issuance but will not to be updated thereafter. 1.1.4 本手册有两种版本,受控本和非受控本,公司的质量控制活动只能用受控本,受控本的发放和保存都应是最新版本按本章的受控规定进行发放。非受控本仅供公司外参考,它只在发放时是最新版,而不保持最新版本。

1.2 Distribution 1.2 手册的分发

1.2.1 The Examination Engineer shall hand carry the controlled QC Manual to each holder who is designated by the QA Manager and shown on the QC Manual Holder's List (Exhibit 1-2) that shall be prepared by the Examination Section Chief. The holder shall sign and date the list to acknowledge the receipt. Each Manual will bear the same number on its Cover Sheet as is shown on the list. 1.2.1 “手册受控版本持有者的名单”(样表1-2)由质检科长负责编制,质保经理批准。检验工程师根据此名单将手册发放给受控手册持有者手中,持有者应在受控本手册发放表上签字和注明日期,作为收到的依据。每本手册封面应具有如表中所示的相同的编号。

1.2.2 The QA Manager shall provide a controlled copy of QC Manual to the AI. 1.2.2质保经理负责提供一本受控本手册供AI专用。

1.2.3 Uncontrolled QC Manual is distributed in accordance with the instruction of the Examination Section Chief. 1.2.3非受控的质量控制手册应按质检科长的指令发放。

1.3 Revision 1.3 手册的修改

1.3.1 The revision to the QC Manual shall 1.3.1 质量控制手册的修改和批准程序与手

be prepared and approved in the same manner as the original. Any revision shall be reviewed and accepted by the AI prior to implementation. 册新编时相同。任何修改,在贯彻前应经AI 审查批准。

1.3.2 The QC Manual shall be revised by each Chapter, except for Exhibit form which will be revised individually. The latest revision number of each Chapter shall be indicated on the TABLE OF CONTENTS page of Chapter A and each page of the revised Chapter. 1.3.2 质量控制手册更改采用整章更换办法,样表则按页更换。每章的最新修改标记,要在A章目录和修改章的每页上同时注明。

1.3.3 The revision number of the cover sheet and the TABLE OF CONTENTS chapter of QC Manual shall be advanced whenever one or more chapters are revised. When revising an Exhibit form, Exhibit Form Index Chapter 13 shall also be revised to show the latest revision of each Exhibit form. 1.3.3质量控制手册的一章或多章被修改时,其目录章和封面的修改号应升级。当一页样表修改时,第13章“样表”章的目录页也要修改,表明所修改的每个样表都是最新修改。

1.3.4 For Chapter,the revised wording shall be written in bold italics. For Exhibit form, a cloudy lines shall be placed around the revised portion. The bold italics and cloudy line shall remain only for the latest revision. 1.3.4 手册各章节中修改的词句用加黑的斜体字书写,样表用云彩线,显于修改部分的周围,这种加黑的斜体字和云彩线只在最新的修改上保持。

1.3.5 The QA manager may at his option or every three years commensurate with the ASME Joint Review, develop a new edition to the QC Manual. New edition shall be approved and distributed in the same manner as a new revision, except revision highlights or indicators are not required and the revision level of all chapters and Exhibit form will revert to zero. 1.3.5质保经理可以决定,或者每3年随着ASME联检,制定新版质控手册,新版的批准和发放方式和新修改版相同,除掉修改的着重标记不要求之外,各章和样表的修改版次将回到零。

1.3.6 The revised Chapter or Exhibit form shall be issued together with the Cover page and the TABLE OF CONTENTS page of Chapter A, including Exhibit Form Index when Exhibit forms are revised. The obsolete copy shall be retrieved and destroyed by the Examination Engineer, when distributing the revised copy to the holder except that one obsolete copy shall be marked "superseded" and kept on file by QA Manager for reference and revision history. 1.3.6修改章或修改样表将与封页和A章的目录页包括“样表”章的目录一起发放,当修改样表时,样表目录页也一起发放。当把修订本发到持有者手中时,除了一些标有“作废”的旧版本可作为参考和修订历史记录由质保经理保存外,其余旧版本将由检验工程师收回并销毁。

1.4 Translation 1.4 翻译

1.4.1 The Chinese version of the QC Manual and procedures shall be provided for the individuals who do not comprehend English. The QA Manager shall be responsible for the translation to the Chinese version. 1.4.1 应为不理解英语的人员提供中文版质控手册和程序文件,质保经理负责中文版翻译的准确性。

1.4.2 The Chinese version shall be prepared, approved, controlled and issued as required for the English version, The Chinese version shall become effective after AI accepts the English version of the QC Manual and procedure. 1.4.2 质量控制手册的中文版按照与英文版的要求编制,批准,控制,分发更改。中文版本应在AI 批准英文版本的质量控制手册以及程序文件后执行。

2.0 ORGANIZATION 2.0 组织机构

The Organization Chart of the Company is shown in Fig. 2-1. The Quality Control function is independent from production. This way, the Examination personnel will hav e the freedom and authority to implement Quality Control measures as described in this Manual.

本章提供了组织机构如图2-1所示,质量控制的功能应独立于其他运作。这样,质量人员就具有完成质量手册所赋予任务的权利。

2.1 The Organization Chart defines the job titles of each department and section or personnel. Where a department or section is referenced in the QC Manual, it shall include the manager or his designee. The Manager may delegate the performance of the specific task to qualified indiv iduals, but he retains responsibility. 2.1组织机构图规定了每个部门和科室的工作职别。在质控手册中提到的某个部门或某个科,则包括部门长或他的指定者。部门长在保留责任的情况下可以将一些具体的任务指定给具有相应资力的人。

2.2 The solid line in the Organization Chart shows the relationship of various job titles up to the top management. 2.2组织机构图中的实线示出各工作职能直到最高管理层的关系。

2.3 The responsibilities and authorities for each department, section or personnel are described throughout each Chapter of the QC Manual. 2.3每个部、科室或人员的责任和权力见本质控手册各章节。

YTMC

3.0 DRAWINGS, DESIGN CALCULATIONS,

AND SPECIFICATIONS CONTROL

3.0 图纸、设计计算和技术条件的管理

This Chapter establishes the control of the design documents including drawings, design calculations, and specifications to assure that the design is in compliance with Customer’s Specification and Code.

本章规定了设计文件(包括图纸、设计计算和技术条件)的控制以此来保证设计符合规范和客户技术条件的规定。

3.1 General 3.1 总则

3.1.1 The design of Code Items consist of the

following:

3.1.1 规范产品的设计有以下两类:

a) Designing by YTMC. a)企业自行设计;

b) Designing by the customer or his

designated agent.

b)由用户或其代理人完成的设计。

3.2 Review of Customer Specification 3.2 用户技术条件的审核

3.2.1 Upon receipt of Purchase Order for a Code item which shall be issued to Design Dept. and Manufacture Section by Sales Dept, the customer documents shall be rev iewed by the Design Engineer and accepted by the Manager of Design Dept. to assure that all required data is contained for the design and in compliance with the Code requirements. 3.2.1 接到规范产品订单后, 用户的文件由设计工程师审查, 产品开发部部长认可, 以保证所需设计数据符合规范要求。订单是由销售部门发放给设计部门和生产科。

3.3 Identification of Documents 3.3 文件的标识

3.3.1 The Planner of Manufacture Section shall 3.3.1 设计前, 压力容器厂生产科计划员应负

be responsible for assigning a unique job number for each Code Item before starting the design based on Purchase Order issued by Sales Dept. 责为基于销售部门发放订单上的每个规范产品编制一个唯一的工作令号。

3.3.2 Any document to be issued for the fabrication shall be identified with the job number, document number including rev ision number. The documents to be used in the workshop shall be marked with "For Construction" and "ASME" plus "U". 3.3.2 任何用于生产的文件必须带有工号、文件号(包括修改标记),公司内所用的文件应标注“For Construction”和“ASME”加“U”。

3.4 Preparation of Design Document 3.4 设计文件的编制

3.4.1 Upon acceptance of Customer's Specification by the Manager of Design Dept, the Design Engineer shall prepare the drawings, design calculation, and material requisition in accordance with the requirements of the applicable Code Section, edition & addenda and the Customer's Specification. These documents shall be reviewed by the Manager of Design Department and approv ed by the Chief Engineer. 3.4.1 产品开发部部长接到用户技术条件后, 设计工程师按照适用规范篇章、版本和增补及用户技术条件的要求编制图纸、设计计算书、材料请购单和需要时编制采购技术条件,这些文件(总图和计算书除外)由产品开发部部长批准。而总图和计算书由产品开发部部长审核, 总工程师批准。

3.4.1.1 Either U.S customary units or SI units may be used, but only one sy stem shall be used consistently throughout for all phases of construction. (eg. design, material, fabrication and reports) All entries on a Manufacturer’s Data Report and data for Code-required Nameplate marking shall be in units consistent with the drawing for the component using U.S 3.4.1.1在整个质控体系的贯穿实施过程中(如:设计、材料、制造和报告),英制单位或公制单位都可以采用,但必须统一起来只可用同一种单位制度。所有制造数据报告和铭牌标记的记录都应该同图纸一致,采用英制单位、公制单位或当地习惯的单位制。

Customary, SI, or Local customary units.

3.4.1.2 As a minimum, the design drawing shall contain the following requirements: 3.4.1.2作为最低要求,设计图纸应包括下列要求:

Applied Code Edition, Addenda and Code case, ( if applicable)

适用的规范版本、增补和规范案例(如果适用的话);

Design and operating pressure, 设计压力和工作压力;

MAWP 最大许用工作压力;

MAEWP ( if applicable) 最大许用外部工作压力(如果适用的话);Design and operating temperature, 设计温度和工作温度;

Minimum design metal temp (MDMT), 最低设计金属温度;

Material specification and designation, 材料牌号;

NDE requirement, 无损检测要求;

Heat treatment requirement, 热处理要求;

Test of Pressure, 试验压力;

Joint detail, 焊缝类型;

Impact testing requirement, 冲击要求;

Corrosion allowance, 腐蚀裕量;

Tolerances, 尺寸公差;

Code nameplate stamping information. 要打钢印铭牌的数据。

3.4.2 When the customer furnishes the drawings, design calculations, these documents shall be rev iewed and approv ed in the same manner as described in Para.3.4.1 abov e. YTMC shall have total Code responsibility for these documents. 3.4.2 当设计图纸、计算书、材料技术条件是由用户完成时,这些文件的审查和批准同上3.4.1节所述。本公司对这些文件负有总的规范责任。

3.4.3 All the drawings and calculation sheets

shall be presented to the AI for rev iew

3.4.3 所有图纸和设计计算书应提交AI审阅。

3.5 Revision 3.5 修改

3.5.1 When a revision is required to the design, the design document shall be rev ised, rev iewed and approved in the same manner as the original. The revision status shall be indicated on the rev ised documents adjacent to the affected portion using the rev ision number in a triangle. 3.5.1当需要对设计进行修改时,设计文件的修改、审查和批准按原规定进行,修改情况应在修改后的文件中靠近修改的部位用带修改好的三角形注明。

3.5.2 Rev isions to the design documents shall be made using either lining out, initial and dating, and hand entering new data or printing a new rev ised copy. When a rev ised copy is issued, a cloudy line shall be placed around the rev ised portion. The above rev isions shall be marked using the revision number in a triangle adjacent to the rev ised portion. 3.5.2 修订的设计文件部分也可用画线,首字母大写并标注日期,手写上新的日期或者是印刷一新的修订本副本标示出来。当修订副本需要发行时,修改处应用曲线标出,修改情况应在上述修订文件中靠近修改的部位用带修改好的三角形注明。

3.5.3 When the design documents need to be rev ised, the Document Rev ision Notice (Exhibit 3-2) shall be prepared by the Designer, rev iewed by the Design Engineer and approved by the Design Manager. 3.5.3 当设计文件需要修改时,设计者应编制文件修改通知(样表3-2),并由设计工程师审查,产品开发部长批准。

3.5.4 One obsolete copy shall be kept in the Design Department until the MDR for the Code Item is certified. The obsolete copy shall be marked with “Superseded” and shall not be used for fabrication. 3.5.4 产品开发部应保留一份作废的版本直到规范产品的制造厂数据报告被鉴定为止,作废的版本应标注“作废”并不能用于生产。

3.5.5 Any rev isions shall be informed to the AI

for attention.

3.5.5 任何修改应通知AI。

3.6 Distribution 3.6 发放

3.6.1 Any design document prepared for fabrication shall be listed on the Document Issuance List (Exhibit 3-1) which shall be prepared by the Design Engineer, approved by the Manager of Design Department, and any quality system, fabrication & examination document prepared for fabrication shall be listed also on the Document Issuance List (Exhibit 3-1) which shall be prepared by the Document Keeper of the Pressure Vessel Factory, approv ed by the Examination Chief. 3.6.1 用于制造的任何设计文件应在文件发放表(样表3-1)上列出,该表由设计工程师编制,产品开发部部长批准。任何程序文件、制造和检验文件也应在文件发放表(样表3-1)上列出,由压力容器厂资料员编制,检验科长批准。

3.6.2 The Document Issuance List shall show the job number, document & rev ision number, title, and department & number of copies to be distributed. 3.6.2文件发放表上应注明工号、文件号、修改标记、名称、部门及发放的复制件的数量。

3.6.3 The Document Keeper of Design Department copies the drawings in accordance with the Document Issuance List and hand carries the copies of the document tothe Department or Section as required in the Document Issuance List. These copies shall accompany the copy of Document Issuance List showing the latest rev ision status of each document. 3.6.3产品开发部的资料员将文件的复制件分发到文件发放表中列出的部门,这些文件及附带的文件发放表将表明每个文件的最后修改情况。

3.6.4 The Document Keeper shall ask the receiver to sign and date the original Document Issuance List to acknowledge the receipt. He shall verify all documents have been distributed to any Department or Section as required, by 3.6.4 资料员发放文件时,应要求接收者在文件发放表上签字,注明日期,证明已经收到。文件发放完毕时根据发放表(样表3-1)上签字情况来核实已经发放的所有文件确实已发到规定的部门。当发放修改文件时,应收回并销毁旧件,若

signing and dating the Document Issuance List at completion of distribution. When distributing rev ised documents by the Document Issuance List (Exhibit 3-1), he shall retriev e and destroy the obsolete copies or will permit to keep the obsolete copies in such Department or Section prov ided the obsolete copies are clearly marked "Superseded". 部门已在复制件上清楚地标注“作废”则可保留旧件。

ASME压力测试程序文件

Pressure Testing Procedure 压力测试程序 Prepared by Date _____________ 编制:日期: Approved by _________________ Date ____________ 批准:日期: Accepted by _________________ Date ____________ 认可:日期:

1. Scope 围 1.1 This procedure describes the control of operation and inspection for pressure testing of pressure vessel which is constructed in according to ASME SectionⅠ,B31.1and VIII Div.1. 本程序为根据ASME第Ⅰ卷,B31.1和第Ⅷ卷第1分册制造的锅炉/压力容器的压力试验的操作规定了控制程序。 1.2 This procedure is supplementary requirement to the QC Manual. 本程序是质量手册的补充要求。 2 Preparation before Pressure Testing 在压力试验前的准备 2.1 Hydrostatic pressure test shall be carried out after all fabrication works has been finished. QC Engineer shall verify that all required fabrication, examination, inspection and test activities have been completed, especially those inspection points established by AI have been properly closed. All Nonconformity Reports have been completely closed if existed. 在所有制造工作完全完成之后,应实施水压试验。质量经理应检验所有要求的制造、检验、检查和测试行为都已经被完成,特别是那些已经由AI建立并已经适当地关闭的检验点。 2.2Before hydrostatic pressure testing, QC Engineer shall carry out visual inspections both internally and externally with Examiner on the Code items. If such inspection is requested by AI, AI’s visual inspection, dimensional check shall be carried out prior to the pressure test and the result shall be acceptable. 在水压试验之前,质量工程师和检验员应对规产品执行目测检验。如果AI要求检验,AI的目测建议和尺寸建议应在压力测试和结果被接受之前进行。 2.3The being pressure tested vessels shall be clean and free from any oil, grease, paint and other dirties. The outside surface of the vessel shall be kept dry and clean during the period of pressure test. The testing equipment shall be examined to that it is tight and that all

某公司的质量手册的管理(doc 17页)

某公司的质量手册的管理(doc 17页)

目录 0 质量手册修订页 (2) 1 质量手册的管理 (3) 2 公司简介………………………………………………………………………………………………………………………………………. 3-4 3 引用标准 (4) 4 质量管理体系………………………………………………………………………………………………………………………………. 4-5 5 管理职责……………………………………………………………………………………………………………………………………….. 5-7 6 资源管理……………………………………………………………………………………………………………………………………….. 7-8 7 产品的实现…………………………………………………………………………………………………………………………………. 8-10 8 量测、分析和改

进………………………………………………………………………………………………………………………. 11-13 附件一公司质量管理体系组织结构图 (14) 附件二质量管理体系之过程关系图 (15) 附件三ISO 9001:2000条文要求与本公司程序文件对照表………………………………………………16-17

1.0 质量手册的管理 本公司为建立ISO9000质量管理体系以规范并改进本公司管理体系以达到客户满意,特制定本质量手册,以作为质量管理活动的指南。 本手册由总经理室根据ISO9001:2000年版质量管理国际标准要求、结合企业现状和发展需要制定。手册产生之后,将提交管理代表审查、总经理核准后颁布生效。当下列情况发生时,应对手册进行修改。手册修改时,同样应经以上权责人员审查、核准后方可生效: A 当公司组织结构发生变化时; B 当公司质量管理活动发生重大变化时; C 当引用的ISO9000国际标准版本修订时; D 公司高层领导认为需要进行修改时。 经核准后的手册,依照《文件与资料管理程序》进行编号、分发使用。当文件修改时,亦按照《文件与资料管理程序》要求回收旧版文件、发行新文件。质量手册允许进行单页版本修订。修订时,应于修订页中注明修正情形。当本手册其中一页修正次数超过10次时,则应对质量手册进行整本改版,依次为01、02、03、04、05、06、……99。。。。

ASME工艺评定基本要求

ASME焊接文件的编制以及焊工的考核过程 1.当产品设计图纸完成以后,焊接工程师根据按照ASME规范编制的“压力容器质量手册”的要求编写焊接接头识别卡。根据设计图纸标明的按照ASME规范2001版第8.1篇(ASME SEC .ⅧDIV. 1 2001 EDITION)分类的A类,B类,C类,D类焊接接头,给每个接头编号,规定每个接头所遵循的焊接工艺指导书(WPS),材料类别号或者组别号,以及焊接方法和可行的焊接位置。 2.焊接工程师按照质量手册的要求参照焊接接头识别卡编写第零版焊接工艺指导书(WPS Rev. 0)。 2.1 WPS,以及后来的PQR,WPQ等等所有ASME文件的格式最好对照ASME规范2001版第九卷(ASME SEC .Ⅸ)末尾的附录中的样表的格式,WPS当中,必须包括对所有重要变素的描述,见QW252-260。 2.2 WPS当中的变素按照ASME规范2001版第九卷(ASME SEC .Ⅸ2002 EDITION)QW250的叙述。QW252(OFW)燃料氧气焊,QW253(SMAW)焊条电弧焊,QW254(SAW)埋弧焊,QW255(GMAW and FCAW)气体保护焊及药芯

焊丝气体保护焊,QW256(GTAW)钨极氩弧焊,QW257(PAW)等离子焊,QW258(ESW)电渣焊,QW259(EGW)电气焊,QW260(EBW)电子束焊。 3.根据ASME规范2001版第8.1篇(ASME SEC .ⅧDIV. 1 2001 EDITION)的UW-28的规定,对所遵循的每一项焊接工艺作出工艺评定(PQR)。 3.1 焊接工艺评定的材料与设计图纸相同,SA662-C+SA662-C;SA662-C+SM-400。SA662-C 按照ASME规范第九卷(ASME SEC .Ⅸ)中QW-420材料的分组,类别属于P-No.1,组别属于Group No.2,强度等级C,亦即最小抗拉强度70-90ksi,大约相当于485-600Mpa。钢号UNS No.K02007。SM-400的性能接近20号钢。工艺评定用母材与评定母材的适用范围应遵循QW-424的规定,并体现在WPS中。焊接工艺评定是在ASME规范第九卷(ASME SEC .Ⅸ)QW-200各项条款的指导下进行的。 3.2焊接材料的选用,根据ASME规范2001版第8.1篇(ASME SEC .ⅧDIV. 1 2001 EDITION)的UCS-67的规定,焊接材料的MDMT(低温冲击试验温度)不应高于母材的MDMT。在表UCS-66中,设计厚度取0.4375英寸,材料SA662取曲线B,得出的低温冲击试验豁免温度是–13华氏度,由于产品的工作温度是100摄氏度以上,所以在焊

公司质量控制手册

公司质量控制手册 简介 H&M 颁布了《生产及质量控制手册》(GPQ),旨在和供货商就双方可以接受的质量标准达成一致。GPQ应该被作为尽早发现并解决问题的一个指导。G PQ 明确规定了H&M公司的规则.要求.限制.条件及标准相一致的最低质量控制要求。G PQ 被视作是H&M公司同供货商之间就定单所达成的合同。合同的其余部分包括H&M公司的所有其它正式文件。见第三页。 供货商有责任保证第三页上的所有H&M公司的正式文件同纱线.布料及附件供货商都加以了沟通。 如果上述这些文件所提出的要求没有被执行或达到,H&M公司保留取消订单或将原订单重新处置的权利。由于没有达到这些规定而由此产生的任何费用将由供货商承担。引起的法律诉讼按进口国的法律程序进行。 从生产的计划阶段直到大货出运的整个过程都要进行质量控制,这一点很重要。 服装检验的目的是目测检查服装,根据所有H&M公司的正式文件的规定和H&M公司已接受产前确认样的标准来评判服装的整体形态和外观。H &M 公司要求在生产过程中的所有环节中对系统和工艺进行实时检查。对于H&M 公司的每一份订单,都必须有最终的质量控制报告,以保证质量符合要求。H &M公司的质量控制人员会在生产期间定期到供货商处查看,监督并确保供货商严格

执行了H&M公司质量标准与要求。H&M公司人员应当有权利在生产前.生产期间以及生产后的任何时间都能随时检查所有服装和查阅所有记录。 但是,检验的主要目的不仅是检查出次品的百分率,更要指出可能存在的问题,以及能够在以后的生产中尽早纠正这些问题。H &M公司要求供货商: * 员工接受过与他们的工作相关的培训。 * 对服装的全部相关部份都要有记录:面料.辅料.包装材料.衣架等 * 在整个生产过程中对检查结果加以记录。 * 在疵点出现之前及时发现问题 * 出现疵点后立即停止生产* 明确问题,查出原因,并防止问题再次发生。H &M 正式文件 * H&M公司订货单.尺寸表.纸样.结构图.尺寸和颜色搭配表.商标指示.生产单和细节说明等 * H&M公司的《行为准则》 * H&M公司《质量标准与要求》 * H&M公司的《童装安全性要求》 * H&M公司《有关化学品的限制》 * H&M公司《太阳眼镜的限制》 * H&M 公司交货及贸易条件(H&M D&TC),交货的条款及交货方式。供货商所在国应持有两者其中之一。 * H&M公司标准购买条件* “ICC Incoterms”的最新版本 制造手册1样品程序 1.1 一般规则 * 在订单上已经写明所要求的服装尺码和每一个样品的交货期限。直到H&M公司认可了供货商提供的产前确认样后,订单方才生效。如果产前确认样到达H&M公司的时间晚于

ASME 简介

ASME 职能 ASME 认证咨询服务流程 ASME规范目录 [编辑本段] 职能 ASME是American Society of Mechanical Engineers(美国机械工程师协会)的英文缩写。美国机械工程师协会成立于1880年,在世界各地建有分部,是一个有很大权威和影响的国际性学术组织。ASME主要从事发展机械工程及其有关领域的科学技术,鼓励基础研究,促进学术交流,发展与其他工程学、协会的合作,开展标准化活动,制定机械规范和标准。它拥有125000个成员,管理着全世界最大的技术出版署,主持每年30个技术会议,200个专业发展课程,并制订了许多工业和制造标准。 自成立以来,ASME领导了机械标准的发展,从最初的螺纹标准开始到现在已发展了超过600多个标准。1911年成立了锅炉机械指令委员会,在1914到1915年颁布了机械指令,以后该指令又与各个州及加拿大的法律相结合。ASME 已成为主要在技术、教育及调查领域内世界性的工程学机构。此外,ASME还是ANSI五个发起单位之一。ANSI的机械类标准,主要由它协助提出,并代表美国家标准委员会技术顾问小组,参加ISO的活动。 [编辑本段] ASME 认证咨询服务流程 一、与提供ASME 认证咨询服务的机构签订咨询服务合同。 二、申请单位(制造厂商)与授权检验机构(AIA )签订ASME 制造厂检验合同(MIC),并按合同规定分期付费。 三、申请单位向ASME 发函,获取申请表格。 四、向ASME 邮寄申请表和申请费、申请费和差旅费预付款,并向ASME 购买原版ASME 规范书籍。

五、编制满足ASME 认证要求的质量管理体系文件(中英文对照稿)。 六、做好接受审核的准备 1 .申请单位组建ASME 迎检工作小组, 与AIA 共同配合。ASME 迎检工作小组成员应由负责设计、采购、焊接、铸造、无损探伤、质量控制以及质量保证人员组成; 2 .质量手册和质量控制程序的准备。 七、联检的日期按照ASME 安排的日程进行,人员有ASME 的代表和授权检验机构(AIA )的主任授权检验师(AIS )和授权检验师(AI )组成。通常联检需要两天。 八、ASME 收到联检组的推荐结果后做出最终结论,如果同意发证,ASME 将在联检结素后大约两个月左右给申请单位颁发ASME 钢印和授权证书。 九、ASME 钢印产品的检验:申请单位取得ASME 证书后,任何需要打AS ME 钢印的产品,均需ASME 授权检验师(AI )的检验。具体的检验服务和相应的检验费用按照AI A 与申请单位所签订的检验合同(MIC ),也可与授权检验机构(AIA )另行议定。 十、ASME 钢印和证书三年有效,三年以后将进行换证,程序和要求同取证一样。 [编辑本段] ASME规范目录 ASME B1.1-1989(R2001)统一英制螺纹 ASME B1.12-1987(R1998)5级过盈配合螺纹 ASME B1.20.3-1976(R1998)干密封管螺纹(英制) ASME B1.20.5-1991(R1998)干密封管螺纹的检测(英制) ASME B1.20.7-1991(R1998)软管接头螺纹(英制) ASME B1.3M-1992(R2001)螺纹尺寸验收的检测体系—英寸和米制螺纹(U N、UNR、UNJ、M和MJ) ASME B1.5-1997 爱克母(ACME)螺纹 ASME B1.8-1988(R1994) 矮牙爱克母螺纹 ASME B107.46-1998 螺柱、螺钉和管道提取器:安全要求 ASME B16.10-1992 阀门的面至面和端至端尺寸 ASME B16.10-2000 阀门的面对面和端至端的尺寸 ASME B16.11-1996 承插焊式和螺纹式锻造管件 ASME B16.11-2001(2002年颁布)承插焊式和螺纹式锻造管件 ASME B16.1-1998 铸铁管法兰和法兰管件(25、125和250磅级) ASME B16.14-1991 钢铁管螺纹管堵、内外螺丝和锁紧螺母 ASME B16.15-1985 (R1994)铸青铜螺纹管配件(125和250磅级) ASME B16.18-1984(R1994)铸铜合金钎焊接头受压管配件

机电安装工程质量控制要点(参考知名建设集团质量控制手册)

XX建设集团新业务板块 机电安装公司 工程质量控制手册项目名称: 编制人: 审核人: 批准人:

目录 第一章工程质量目标 0 第二章质量管理网络 0 第三章质量管理制度 (3) 1.施工组织设计、施工方案、施工技术交底制度 (3) 2.定期质量分析会制度 (3) 3.工程质量检查评比、奖惩制度 (4) 4.全员质量教育制度 (4) 5.样板先行制度 (5) 6.工序检查验收程序、制度 (5) 7.原材料、构配、件成品半成品质量验收制度 (6) 第四章质量管理职能分工 (6) 1.项目经理质量职责 (6) 2.项目总工程师(技术负责人)质量职责 (7) 3.质量总监/质监工程师质量职责 (7) 4.专业工程师质量职责 (8) 第五章质量控制措施 (8) 1.质量文件控制 (8) 2.采购质量控制 (9) 3.甲供产品控制 (9) 4.产品质量标识和可追溯性 (9) 5.质量过程控制 (10) 6.设备质量检验和试验 (12) 7.不合格品的控制 (12)

8.质量记录的控制 (13) 第六章质量控制工艺流程 (13) 1.专项技术及质量控制保证措施 (13) 1.1 电气安装工程 (13) 1.2 管道安装工程 (14) 1.3 通风空调安装工程 (15) 2.关键工序技术及质量控制保证措施(详细技术交底或作业指导书另行编制) (16) 2.1 预留预埋 (16) 2.2 卫生器具安装 (17) 2.3 配电箱安装 (17) 2.4 配管 (18) 2.5 管内穿线 (19) 2.6 电缆线路敷设 (20) 2.7 电气器具安装 (21) 2.8 防雷及接地装置安装 (22) 2.9 金属风管制作、安装 (22) 2.10 风机盘管安装 (23) 2.11 风口安装 (24) 2.12 水泵安装 (24) 2.13 排水机制铸铁管安装 (24) 2.14 管道、冲洗试压 (26) 2.15 防腐保温 (27) 2.16 调试 (27) 3冬季施工质量保证措施 (28) 4成品保护措施 (28)

某物业管理公司质量控制手册范本

1. 目的 通过消除在向顾客提供服务过程中已被发现的适用围的不合格或其他不期望情况的出现,防止类似的不合格再次发生,实现公司服务质量日常持续改进,以达到促进公司质量管理体系的持续改进。 2.适用围 2.1发生在辖区的各类刑事案件和重大火灾未遂和大小火灾事故; 2.2无论何种原因(如跑水、自然灾害、人为原因等)造成公司自身损失或小区公共设备、设施等损坏,估算损失在1000元以上的各类事件; 2.3无论何种原因造成顾客个人财产损失,且对方向我方提出索赔要求的各类事件; 2.4轻伤以上的工伤事故及重大工伤; 2.5政府有关部门,各类新闻媒体已介入的对我抱怨事件; 2.6小业主三人以上联名抱怨的事件及其它的顾客重大抱怨; 2.7有可能造成公司声誉损害及经济损失的各类事件; 2.8公司服务质量检查中发现的严重服务质量不合格 2.9部服务质量检查、部质量审核、管理评审和第三方审核以及政府验评中发现的严重不合格; 3.职责 3.1质量管理部负责识别和向公司主管经理报告2.8、2.9中描述的不合格情况。 3.2各单位(部门)负责人负责识别和在第一时间依照职责和权限对在本单位发生的除2.8、2.9外的上述情况进行处理,并在24小时以口头形式向公司主管经理报告。 3.3各单位(部门)负责人负责制定相应的纠正措施并对一般顾客抱怨进行跟踪和验证。 3.4公司主管副总负责评价确保不再发生的措施需求并安排相关部门对纠正措施的执行进行跟踪和验证; 3.5对顾客抱怨的处理结果,应通报顾客征求意见,进行或上门回访。 4.容 4.1当发生2.0中描述的情况时,各单位(部门)必须首先按《不合格控制程序》进行有效处理; 4.2公司主管经理负责安排相关部门和责任单位(部门)一起调查、分析产生不合格的原因,从对成本、业绩、可信性、安全性和顾客满意等方面的影响来评价出现的不合格对质量影响的重要程度; 4.3责任部门为消除不合格产生原因,确保不合格不再发生,针对调查、分析的不合格原因制定纠

ASME锅炉压力容器认证项目流程介绍及常见问题

ASME锅炉压力容器认证项目流程介绍及常见问题 ASME锅炉和压力容器(BPV)认证项目表明持证单位的设计、制造、组装和检验锅炉压力容器部件符合各项规定。于1916年首次发表“固定式锅炉的建造和许用工作压力的规范”(现在称为ASME BPVC)后不久,ASME开始为承压设备行业的企业提供认证项目,用来证明他们的质量管理体系符合标准。目前全球近7000个厂商持有ASME认证证书。 ASME BPV认证项目的范围广泛,包括但不限于:动力锅炉、供热锅炉、压力容器、纤维增强塑料压力容器、运输罐和阀门。 ASME BPV证书 ASME BPV持证厂商制造的产品是根据ASME BPVC所适用的部分被认证和打钢印的。目前,ASME提供下列几种证书: 动力锅炉 第I卷 S-动力锅炉 A-动力锅炉安装 E-电热锅炉 M-小型锅炉 PP-压力管道 V-动力锅炉安全阀 PRT-部件制造 供热锅炉 第IV卷 H-供热锅炉/采暖(铸铁)锅炉 HLW-带衬里的饮水加热器 HV-供热锅炉安全阀 PRT-部件制造 压力容器 第VIII卷第1册 U-压力容器(常规设计) UM-小型压力容器 UV-压力容器安全阀 UD-压力容器泄压装置 PRT-部件制造 压力容器 第VIII卷第2册 U2-压力容器(压力容器另一规则) 压力容器

第VIII卷第3册 U3-高压容器 UV3-高压容器安全阀 UD3-高压容器泄压装置 纤维增强塑料压力容器 第X卷 RP-纤维增强塑料压力容器 运输罐 第XII卷 T-运输罐 TV-运输罐安全阀 TD-运输罐泄压装置 PRT-部件制造 如何开始申请 第1步:准备和申请 登陆网址:https://www.doczj.com/doc/0b17298727.html,/bpv浏览所有申请要求、BPV清单、常见问题,并确定被ASME认证的工作范围。 在提交申请前需要完成的其他内容包括: -获取所需标准(更多详细内容,请登录网站https://www.doczj.com/doc/0b17298727.html,/requiredcodebooks)。 -如标准中有规定则需要与授权检验机构(AIA)签订合同。 -准备与符合BPVC所适用部分标准的质量体系并且培训人员执行这一质量体系。 当你完成上述步骤后,在线提出认证申请。 第2步:联检 联检的目的是评估申请者的质量控制手册和执行质量控制手册的能力。联检的范围由ASME基于申请者在申请中描述的预期活动范围。 ASME会对申请者在质量控制手册中提及的所有会影响和控制质量的活动点进行审查,ASME将在双方方便的日期安排评审组申请表格中提到的地点进行联检。 涉及现场审核的步骤包括: 1、手册审核:第一天审核手册,一般不在申请者的设施内进行。所用时间取决于手册的大小和复杂程度,一般需要3-5个小时。一般评审组会在首次会议时候讨论审核手册时的发现。 在联检完成之前,申请者需要提供一份修改后的质量手册给联检组,该手册要包含由联检组和检验师/

[中建]工程项目质量控制工作手册(126页)[详细]

工程质量控制工作手册

前言:建筑工程质量管理工作以“GB/T19001—20XX”、“GB/T50430—20XX”、“建筑工程施工质量统一验收标准”三个规范为基础;以“工程局20XXC/0版《管理体系程序文件汇编》相关文件”、工程局“项目管理手册”相关规定、工程局“项目部质量管理检查考核办法”三个文件为准则;施行“标准化”与“全面质量管理”相结合的管理模式;以“提质增效”为主题;在“成败在质量”的管理理念的指导下,本手册对项目质量管理进行系统的梳理,按流程分步骤进行解析,旨在使项目质量管理标准化、流程化;达到管理的目的。 前期准备: 1、资料档案盒36个; 2、档案盒侧立面标签见附件《资料封面》—档案盒标签; 3、各种资料封面见附件《资料封面》; 4、检查验收常用工具(包括靠尺、游标卡尺、回弹仪、扭力扳手、万用表等); 5、相关国家、地方及企业现行规范、规定及标准等,过期更新; 第一步:质量策划

时间:《工程承包合同》签订后15个工作日内; 内容: 1、《工程承包合同》签订后,根据《工程承包合同》、国家、地方、企业自身对该工程“质量”的相关要求,由公司“技术·质量部”进行策划,项目工程部负责组织、实施,公司主管领导审批,该策划一式三份,公司工程部、技术·质量部、项目部各留存一份; 2、“策划”主要编写内容为质量目标的确定、质量体系的建立、创优策划和QC小组活动成果策划、实体质量的控制、质量通病防治措施、工程资料管理等; 3、要求:所有工程项目必须全部包括在内,不得有遗漏; 4、制作封面见附件《资料封面》—1“质量策划”;资料包括: 1〕、质量策划及相关审批、签字文件; 2〕、交底记录、交底影像资料; 编写范例:《×××项目质量策划》—附件一⑴; 使用表格:管理交底记录—附件一⑵;

关于ASME证书申请程序

关于ASME证书申请程序 p][/p]ASME证书申请程序 1. The “Applicant”(Manufacturer) sends a telefax / letter to the ASME Accreditatio n Department to request “Application Forms”. 申请者(制造商)与ASME 联系获得《ASME认证申请表》 2.Signing of an inspection Service Agreement between the ALA (Authorized Inspec tion Agency) and the “Applicant”. 申请者与ASME 授权的审查机构签定《审查服务协议》。 3.Completion of the “Applicant Forms” indicating the type of certification and stamp s applied for and “AIA” selected and contracted. 填写《认证申请表》,应注明所要申请的证书和钢印类型,以及申请者签约的ASME 授权的审查机构。 4.The completed “Application Forms” are returned to ASME’s Accreditation depart ment One engineer of the “Applicant” should apply for ASME membership (optional). 将填好的《认证申请表》寄回ASME认证签定部门,申请方能有一名技术人员申请ASME会员(自愿)。 5.Procurement of ASME Code Books as required per type of certification applied for. 按照要求购买所申请ASME证书的相应技术手册。 6.ASME notifies the AIA contracted to confirm to ASME that an inspection Service Agreement has been signed with the “Applicant”. ASME要求申请者联系的授权审查机构,应确认其已经与申请者签定《审查服务协议》。7.The AIA and the “Applicant” establish a Time Schedule for all action be taken t o prepare the joint Review. ASME授权的审查机构与申请者制订时间表,其中包括所有针对联合审查的准备程序。8.Scheduling of the Joint Review date with ASME. ASME授权的审查机构与申请者制定时间表,其中包括所有针对联合审查的准备程序。9.Preparation of the Joint Review 联合审查的准备工作 preparation of the QualityλManual 准备《质量手册》 preparation of a representative component orλcomponent part as demonstration Item 准备审查时要展示或演示的代表性产品和零部件 λpreparation of the Welding Procedure Specification(WPS) 准备《焊接程序规范》 λqualification of the Procedure Qualification Record (PQR) 《程序要求记录》的建立水平

质量管理手册范本

重庆公司质量手册200 年月日

目录 0企业概况 1.质量管理职责 1.1组织领导 1.1.1组织结构图 1.1.2任命书 1.1.3管理手册发布令 1.1.4 关于设立质管科的决定 质管科职责和权限 1.1.5相关记录 1.2质量目标 1.3管理职责 1.3.1质量管理制度 1.3.2部门职责、权限及考核办法 1.3.3岗位职责 1.3.4不合格品的控制管理办法 1.3.5 相关记录 a《不合格报告》 b《纠正措施处理单》 2.生产资源提供 2.1生产场所 2.1.1 企业区位图 2.1.2生产布局平面示意图

2.1.3 防尘、防鼠、防蝇控制管理办法2.1.4生产车间卫生管理制度 2.1.5相关记录 《卫生检查表》 2.2生产设备 2.2.1设施、设备卫生管理制度 2.2.2管道、设备清洗消毒管理制度2.2.3设备和容器清洁控制程序 2.2.4相关记录 a《设施设备清单》 b《保养、检修、维护计划》 c《保养、检修、维护记录》 2.3人员要求 2.3.1岗位人员任职要求 2.3.2人员健康卫生控制管理制度 2.3.3 相关记录 a《员工登记表》 b《人员培训记录》 3.技术文件管理 3.1技术标准 3.1.1相关记录 a《标准清单》 3.2工艺文件 3.2.1工艺流程图

3.2.2工艺作业指导书 3.3文件管理 3.3.1技术性文件管理制度 3.3.2相关记录 a《文件清单》 b《文件借阅、发放、回收记录》 c《记录清单》 4.采购质量控制 4.1采购制度 4.1.1采购管理制度 4.2采购文件 4.2.1采购原材料的管理办法 4.2.2采购合同 4.2.3食品添加剂的使用规定 4.2.4相关记录 a《合格供方名录》 b《采购计划》 c《采购清单》 4.3采购验证 4.3.1相关记录 a《原辅材料进货验证记录汇总表》b《原辅材料验证记录》 c《原辅材料不合格处理单》 d《包装物进货验证记录汇总表》

质量控制手册模板

质量控制手册

质量控制手册 用于按照ASME第VIII卷第1分册 进行车间生产的压力容器和部件 QUALITY CONTROL MANUAL FOR SHOP CONSTRUCTION OF PRESSURE VESSELS AND PARTS IN ACCORDANCE WITH ASME CODE SECTION VIII, DIVISION 1 生效日期: 年3月20日 EFFECTIVE DATE: Mar. 20 , 上海朗森热工设备有限公司 Shanghai Langsen Thermal Equipment Co., Ltd 上海市嘉定工业区朱桥世盛路760号, 邮编21815

No.760,Shisheng Road, Jiading Industrial Zone, Jiading District, Shanghai 15,P.R.China 质量控制手册QUALITY CONTROL MANUAL 章号Section No. A 修订号Rev. No. 0 总经理授权声明 STATEMENT OF AUTHORITY共1页Page 第1页1 of 1 总经理授权声明 为制造ASME规范项目, 根据”ASME”锅炉和压力容器规范第Ⅷ卷第1分册的要求, 制订并贯彻这套质量控制体系。 质检经理负责建立质控体系, 编制并维护质控手册, 以确保质控体系的有效运转。 所有参与ASME压力容器质量活动的人员必须熟知本手册中与本部门和本人有关的各项规定, 并认真执行。 授权质检经理鉴定质量管理中的问题, 并授权她着手处理, 提出建议或提供解决问题的办法以及核实实施情况, 她将向我报告质控系统的状况和效能。 质检经理与其它部门的负责人之间发生任何分歧, 将由本人经过全面考虑ASME规范和设计要求以及质控手册予以仲裁。 质量控制手册的中文版, 同样是质量控制体系的执行文本。但中文与英文如有差异, 须以英文本为准。 STATEMENT OF AUTHORITY In order to construct ASME Code Items, this Quality Control System has been established and will be maintained based on the requirements of the ASME Boiler & Pressure Vessel Code Section VIII, Division 1. The Quality Manager is assigned the responsibility of establishing a Quality Control System, for preparing and maintaining the Quality Control Manual and for ensuring the effective execution of the System. All persons performing activities affecting the quality of ASME Code Items shall understand and implement the specific provisions of the Quality Control Manual. The Quality Manager is given organizational freedom and the responsibility and authority to identify any quality control problems and to initiate, recommend or provide solutions as well as to verify the implementation of solutions. He shall report the status and effectiveness of the Quality Control System to me. Any conflict between the Quality Manager and other Managers shall be resolved by me, considering completely the ASME Code requirements, design justification and this Quality Control Manual. The Chinese translation of this Quality Control Manual may be used for implementation of the Quality Control System. However, in event of a dispute regarding differences in interpretation between the English text and Chinese translation of Manual, the English text shall take precedence.

ASME取证全面介绍

ASME取证全面介绍 一、ASME背景介绍 ASME是American Society of Mechanical Engineers(美国机械工程师协会)的英文缩写。美国机械工程师协会成立于1880年,在世界各地建有分部,是一个有很大权威和影响的国际性学术组织。ASME主要从事发展机械工程及其有关领域的科学技术,鼓励基础研究,促进学术交流,发展与其他工程学、协会的合作,开展标准化活动,制定机械规范和标准。它拥有125000个成员,管理着 全世界最大的技术出版署,主持每年30个技术会议,200个专业发展课程,并制订了许多工业和 制造标准。 自成立以来,ASME领导了机械标准的发展,从最初的螺纹标准开始到现在已发展了超过600多个标准。1911年成立了锅炉机械指令委员会,在1914到1915年颁布了机械指令,以后该指令又与 各个州及加拿大的法律相结合。ASME 已成为主要在技术、教育及调查领域内世界性的工程学机构。此外,ASME还是ANSI五个发起单位之一。ANSI的机械类标准,主要由它协助提出,并代 表美国家标准委员会技术顾问小组,参加ISO的活动。 二、ASME认证项目分类及适用范畴 ASME认证项目包括以下四大类:  锅炉及压力容器(BPV)  核动力装置(N-Type)  核原料(QSC)  树脂及塑料容器(RTP) 针对这些认证项目,ASME向世界范围内的生产企业授予25种钢印及相应的认证证书。其中字母 U开头的属压力容器范畴,字母H开头的属锅炉类产品范畴,字母N开头的属于核动力装置范畴。目前,我国通过ASME认证的企业,其中大部分获得了U钢印和S钢印。 三、ASME锅炉及压力容器规范 ASME锅炉压力容器规范是一部控制锅炉压力容器设计、制造和检验的安全管理规程,它每年进行一次增补,三年改版一次。其主要内容如下表: 卷号分卷涉及内容 I 动力锅炉建造规则 II A 铁基材料 B 非铁基材料 C 焊条、焊丝及填充金属

H—M公司质量控制手册

H—M公司质量控制手册 简介 H&M 颁布了《生产及质量控制手册》(GPQ),旨在和供货商就双方可以接受的质量标准达成一致。GPQ应该被作为尽早发现并解决问题的一个指导。 GPQ明确规定了H&M公司的规则、要求、限制、条件及标准相一致的最低质量控制要求。 GPQ被视作是H&M公司同供货商之间就定单所达成的合同。合同的其余部分包括H&M公司的所有其它正式文件。见第三页。 供货商有责任保证第三页上的所有H&M公司的正式文件同纱线、布料及附件供货商都加以了沟通。 ?如果上述这些文件所提出的要求没有被执行或达到,H&M公司保留 取消订单或将原订单重新处置的权利。由于没有达到这些规定而由此产生的任何费用将由供货商承担。引起的法律诉讼按进口国的法律程序进行。 从生产的计划阶段直到大货出运的整个过程都要进行质量控制,这一点很重要。 服装检验的目的是目测检查服装,根据所有H&M公司的正式文件的规定和H&M公司已接受产前确认样的标准来评判服装的整体形态和外观。 H&M公司要求在生产过程中的所有环节中对系统和工艺进行实时检查。对于H&M公司的每一份订单,都必须有最终的质量控制报告,以保证质量符合要求。 H&M公司的质量控制人员会在生产期间定期到供货商处查看,监督并确保供货商严格执行了H&M公司质量标准与要求。H&M公司人员

应当有权利在生产前、生产期间以及生产后的任何时间都能随时检查所有服装和查阅所有记录。 但是,检验的主要目的不仅是检查出次品的百分率,更要指出可能存在的问题,以及能够在以后的生产中尽早纠正这些问题。 H&M公司要求供货商:?* 员工接受过与他们的工作相关的培训。* 对服装的全部相关部份都要有记录:面料、辅料、包装材料、衣架等?* 在整个生产过程中对检查结果加以记录。?* 在疵点出现之前及时发现问题?* 出现疵点后立即停止生产?* 明确问题,查出原因,并防止问题再次发生。 ?H&M 正式文件 * H&M公司订货单、尺寸表、纸样、结构图、尺寸和颜色搭配表、商标指示、生产单和细节说明等 * H&M公司的《行为准则》 * H&M公司《质量标准与要求》 * H&M公司的《童装安全性要求》 * H&M公司《有关化学品的限制》 *H&M公司《太阳眼镜的限制》 * H&M公司交货及贸易条件(H&M D&TC),交货的条款及交货方式。供货商所在国应持有两者其中之一。 *H&M公司标准购买条件 * “ICCIncoterm s”的最新版本 制造手册

公司工程项目质量控制工作手册

文件编号:888888工程质量操纵工作手册

目录 1 手册讲明第01页 2 手册修改操纵第02页 3 质管部组织结构与职责第03页 4 工程质量治理总则第05页 5 工程质量检查工作流程第08页 6 工程质量自检第13页 7 工程质量过程监控第19页 8 工程过程文档质量检查第27页 9 工程完工质量检查第30页 10 工程质量问题整改第34页 11 工程中意度调查方法第36页 12 工程质量奖罚措施第39页 13 工程质量操纵中治理人员的处罚规定第42页 14 对违反服务规范的处罚规定第43页 15 免检工程师认证治理实施方法第50页 16 免检工程师资格治理方法第53页 17 工程质量操纵网络治理规定第54页 18 工程文档归档治理规定第55页 19 工程质量检查整改治理规定第56页 20 技术培训与考试治理规定第58页

手册讲明 1.1 手册适用范围 本手册是为本公司进行的华为工程安装和设备维护服务业务而编写。 本手册适用于质检工程师,是质检工程师的工作指导,同时适用于安装调试工程师、各级工程治理人员对工程质量的操纵。 1.2 手册内容 本手册依据公司《质量手册》和本公司的实际相结合编制而成,包括: (a)工程质量治理的总体原则 (b)质检工程师工作流程 (c)质量检查流程 (d)工程过程监控 (e)各项检查制度 (f)工程质量奖罚措施 (g)免检工程师认证和治理 (h)其它质量治理制度

1.3 手册的公布、批准、保管、修改 (a)本手册为公司的受控文件,由质管部经理批准颁布执行。手册治理的所有相关事宜均由质管部统一负责,未经质管部经理批准,任何人不得将手册提供给公司以外的人员。 (b)手册持有者应妥善保管,不得损坏、丢失、随意涂改。 (c)在手册使用期间,如有修改建议,各部门负责人应汇总意见,及时反馈到质管部;质管部应定期对手册的适用性、有效性进行评审;必要时应对手册予以修改,执行《文件操纵程序》的有关规定。

ASME质保体系的建立及ASME U授权证书和钢印的获取

- 22 - 论文广场 石油和化工设备2012年第15卷 ASME质保体系的建立及ASME U授权证书 和钢印的获取 薛显坤1,韩岁平1,贺春2,王影3,王艳玲1 (1 大连东方亿鹏设备制造有限公司,辽宁 大连 116052)(2 大连派思燃气系统股份有限公司,辽宁 大连 116600)(3 大连合成纤维研究设计院股份有限公司,辽宁 大连 116023) [摘 要] 介绍了ASME质保体系的基本内容;对ASME压力容器授权证书及钢印的获取过程进行了重点介绍。[关键词] ASME;质保体系;授权证书;U钢印 作者简介:薛显坤(1982—),男,内蒙古赤峰人,学士,助 理工程师,从事压力容器设计工艺及质量体系管理工作。 ASME 锅炉压力容器规范作为一部国际公认的规范,在国际贸易中获得了广泛的应用,具有较高的知名度和影响力。截至2010年底,我国ASME 持证厂商已达500多家,数量超过加拿大,位居世界第二位,成为美国本土以外持证厂商数量最多的国家,这标志着我国锅炉及压力容器的制造能力和工艺技术已达到新的水平。现有数据显示,从地域分布来看,国内南方企业拥有ASME 授权证书的占大多数,北方企业相对较少。近几年来,北方企业加大了对ASME 的关注,有许多企业按ASME 的要求建立了ASME 压力容器质保体系,并取得了ASME 授权证书及钢印。 作者于2008年到2009年期间作为主要责任人员,参加了大连东方亿鹏设备制造有限公司的ASME 压力容器授权证书和钢印(U )的获取工作,并一次性通过了ASME 组织的联检,获取了相应的资质。 1 ASME 压力容器主要涉及的规范 第Ⅱ卷 材料 PART A-钢铁材料技术条件PART B-有色金属材料技术条件PART C-焊条、焊丝及填充金属技术条件PART D-材料性能第Ⅴ卷 无损检测第Ⅷ卷 压力容器建造规则第一分篇-压力容器建造规则 第二分篇-另一规则 第三分篇-高压容器建造另一规则第Ⅸ卷 焊接和钎焊评定 2 ASME 压力容器质保体系的建立 ASME 压力容器质保体系由质保手册和程序文件组成。 2.1 质保手册的编制 2.1.1 编制质保手册应依据ASME 第Ⅷ卷第一册中有关容器及部件的设计、材料、制造、试验及检验等规范要求进行。2.1.2 手册的组成要素 质保手册一般由如下主要要素组成:授权和职责、组织机构、图纸,设计计算和技术要求的控制、材料控制、检测和检验程序、不一致品的纠正、焊接控制、无损探伤、热处理、检验和试验设备的校验、记录保存、授权检验师、现场组装和安装(如适用)、样表。 2.2程序文件的编制 程序文件是质量手册的补充。根据ASME 第Ⅷ卷第一册、第Ⅱ卷 材料、第Ⅴ卷 无损检测、第Ⅸ卷 焊接和钎焊评定中有关容器及部件的设计、材料、制造、试验及检验等要求进行编制。以下是此次取证时编制的程序文件的目录。